During the first reporting period, the following actions were performed:
- Definition of the state of the art in evacuation systems, user requirements, legal framework and concept of operation (WP2);
- definition of procedures and beginning of the development of PALAEMON academy for training;
- Detailed design of MEV1 and opertion procedures (WP4);
- Development of the first versions of the services to be integrated in the system V1 (bracelets, cameras, Virtual Reality, UAV);
- Development of a first version of the decision support system (framework, health monitoring, decision support);
- System design and integration preparation;
- Dissemination and exploitation as per the plan (WP9).
During the second period, the integration of the system started. The following sequence was fololwed:
Integration of V1 (factory version) . The interfaces between the components were tested.
Completion of the components development.
Integration of system V2.
Installation of sub-systems in real or realistic environment.
Test of VDES segment in Florence.
Test of procedures and Palaemon Academy in Vienna.
Test of the Integrated Safety System on Board tjhe ANEK ship in Athens.
Assessment of the system by the end-users and stakeholders.
-