Effective Lifetime Extension in the Marine Environment for Tidal Energy

Risultati finali

Interim Environmental Report

An updated report detailing site resource characterisation and environmental impact model, to inform test system design. This deliverable relates to tasks T4.1, T4.2 and T4.3.

Behavioural Model Specification

Report setting out the high-level specification and test plan for the behavioural model. This deliverable relates to task T6.1.

Final Report on Operation of ELEMENT on Nova M100

Report on the results of testing the ELEMENT control system on the enhanced Nova M100 turbine in accordance with the Test Plan This deliverable relates to tasks T113 and T114

Verification Framework

Public report detailing the approach and methodology to be used to verify project outputs; data requirements; and links to emerging standards. This deliverable relates to task T3.1.

Local Community Engagement Report

Report detailing the response to community engagement activities regarding tidal energy in the tel estuary This deliverable relates to task T122

Initial Environmental Report

A report detailing site resource characterisation and environmental impact model, to inform test system design. This deliverable relates to tasks T4.1, T4.2 and T4.3.

Final Environmental Report

A report detailing the performance of the environmental impact model including an impact assessment incorporating results from insea testing This deliverable relates to tasks T43 and T44

In-sea Estuary Testing Report

Report on the results of the insea estuary testing in accordance with the Test Plan This deliverable relates to tasks T104 and T106

European Tidal Energy Impact Analysis Report

Report detailing the potential impact of tidal energy on the wider European economy This deliverable relates to task T124

French Estuary Site Assessment

Report summarising the findings of the assessment of French estuary sites suitable for tidal energy including outputs of GIS analysis stakeholder interviews local supply chain analysis and associated socioeconomic benefits This deliverable relates to task T123

Regional Impact Analysis Report

Reporting detailing the socio-economic impact of tidal energy on the local and regional economy. This deliverable relates to task T12.2.

Onshore System Test Report

Report on the results of the onshore testing in accordance with the Test Plan This deliverable relates to tasks T83 and T84

Site Decommissioning Report

Report detailing the decommissioning of the estuary test site This deliverable relates to task T105

Socio-economic Analysis Plan

Report setting out the plan for completing assessment of the socio-economic analysis of tidal energy. This deliverable relates to task T12.1.

Project Website Launch

Launch the project website for the ELEMENT project. This deliverable relates to T2.4.

Pubblicazioni

"""Investigating the flow dynamics and turbulence at a tidal-streamenergy site in a highly energetic estuary"""

Autori: """Maxime Thiebaut, Nolwenn Quillien, Antoine Maison , Herveline Gaborieau, Nicolas Ruiz, Seumas MacKenzie, Gary Connor, Jean-François Filipot """
Pubblicato in: Renewable Energy, Numero 195, 2022, Pagina/e 252-262, ISSN 0960-1481
Editore: Pergamon Press Ltd.
DOI: 10.1016/j.renene.2022.06.020

Prediction of the fouling penalty on the tidal turbine performance and development of its mitigation measures

Autori: Soonseok Song, Yigit Kemal Demirel, Mehmet Atlar, Weichao Shi
Pubblicato in: Applied Energy, Numero 276 (2020) 115498, 2020, Pagina/e 11, ISSN 0306-2619
Editore: Pergamon Press Ltd.
DOI: 10.1016/j.apenergy.2020.115498

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile