CDR Run 1 Report
(öffnet in neuem Fenster)
Designed MMIC’s and packages will be scrutinized from the level of MMIC schematics, layout and simulation performance. The evaluation of simulated performance includes consideration of involved models, small-signal S parameters simulations, Harmonic balance simulations, and EM simulations of passives. The report will include bare-die performance, and a particular focus on the influence from the FOWLP. In this first run the main focus is not on reaching utmost performance of the packaged components, but to understand material system interactions to prepare for high-end performance in the second manufacturing run. The CDR Run 1 will end with the delivery of the stack of GDS files from the design, the different versions and the test patterns as well as the package details. All this material will be documented together with the output from the CDR into a written report
This deliverable is also a milestone, M1
Kick-off meeting
(öffnet in neuem Fenster)
Kick-off meeting to inform all partners about management and communication flows in the project.
Evaluation report run 2
(öffnet in neuem Fenster)
D 4.2 The results of in-package measurements will be presented in a document, the report will detail the best results obtained and present the rational of the choice of MMIC’s. D4.2 will also include results from on-wafer measurements of second iteration MMICs.
Report on Communication, Dissemination and Exploitation actions
(öffnet in neuem Fenster)
The communication, dissemination, and exploitation report will include all such related activities that have been carried out in the project.
Plan for Communication, Dissemination and Exploitation of project results
(öffnet in neuem Fenster)
The communication plan will contain the plan of communication activities, a plan for dissemination of project results and a plan for exploitation of project results and handling of IP rights linked to project outputs
Evaluation report run 1
(öffnet in neuem Fenster)
1 The results of on-wafer measurements of Run 1 MMIC will be presented in a document. The report will also contain the rational of the choice of the MMIC’s for packaging.
CDR Run 2 Report
(öffnet in neuem Fenster)
Designed MMIC’s and packages will be scrutinized from the level of MMIC schematics, layout and simulation performance. The evaluation of simulated performance includes consideration of involved models, small-signal S parameters simulations, Harmonic balance simulations, and EM simulations of passives. In this second run the main focus is to optimize the MMICs for best possible performance, firstly as bare dies but also the possibility to compensate influence from package. The CDR Run 2 will end with the delivery of the stack of GDS files from the design, the different versions and the test patterns as well as the package details. All this material will be documented together with the output from the CDR into a written report.