Leistungen
Remove trial rotor and return facility back to standard awaiting future use by other customers
Test schedule completedCreates the test schedule that describe the requirements of the test facility and additional instrumentation required to meet the test objectivesPrepares the test article by in the facility and prepares it prior to running the full test scheduleRun the test and inform the required expert areas when they are required to assist in the test in order to obtain the required data
Test rotor fitted and balancedCreates the test schedule that describe the requirements of the test facility and additional instrumentation required to meet the test objectives
Analyse all data from the rig with the chosen software packages and methods
BTT displacement data availableConvert displacements to stress using value from FEM and laboratory calibration
LDV tip displacement data availableCompare with steady state LDV scans with strainFEMBTT
Outlines the test to be completed and the resources required
Obtain and strip rotorIdentify a suitable rotor, strip the blades ready for FEM analysis and strain gauge attachement. Perfor NDT of rotor to ensure safe operation
Dissemination, communication and exploitation planDescription of where and how data will be shared and made public
Final report documenting the project results
Veröffentlichungen
Autoren:
M E Mohamed, P Bonello, P Russhard
Veröffentlicht in:
VIRM 12: Vibrations in Rotating Machinery conference, 2020
Herausgeber:
I Mech E
DOI:
10.1201/9781003132639
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor