Skip to main content
Weiter zur Homepage der Europäischen Kommission (öffnet in neuem Fenster)
Deutsch Deutsch
CORDIS - Forschungsergebnisse der EU
CORDIS

cOmmunication Platform for TraffIc ManAgement demonstrator

CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.

Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.

Leistungen

Guidelines and sample code for CDM usage and extension (öffnet in neuem Fenster)

The guidelines shall be published as a wiki Mediawiki engine and associated code samples will be downloadable

CDM online repository, containing the CDM, and documentation (öffnet in neuem Fenster)

It will published as online MediaWiki The CDM itself shall be composed of UML class diagrams grouped in packages and available in jpg eap and xmi formats The geographical aspect will be covered by this deliverable

Rail Business services software and external services web clients (öffnet in neuem Fenster)

Software clients developed in T5.1, T5.2, T5.5 and T5.6, Web clients developed in T5.3 and T5.4: Architecture, testing procedure and results.

Procedure documentation for Application Framework's integration with IL (öffnet in neuem Fenster)

A report including the setup procedure of Application Framework integration with its configuration and testing procedure as done in T58 Moreover this report will include an operative manual about how to install and test a generic TMS service into the Application Framework An example of at least one TMS service with source code will be provided

Procedure documentation for Operator Workstation's integration with IL (öffnet in neuem Fenster)

A report including setup procedure of Operator’s Workstation integration done in T5.7, guidelines to develop GUIs linked to the Integration Layer and some GUIs code source as example. The GUIs examples are developed in T5.7.

HW/SW delivery of IL and AF servers (öffnet in neuem Fenster)

The deliverable will document the outcomes of the T3.3: Description of delivered and configured SW and HW, checking results.

HW/SW delivery of Operator Workstations (öffnet in neuem Fenster)

The deliverable will document the outcomes of the T3.2: Description of delivered and configured SW and HW, checking results.

Mitigation actions for the first level support provided during installation, commissioning and testing phase of the prototypes of the S2R X2RAIL2/4 prototypes (öffnet in neuem Fenster)

This report will include the outcomes the first level support provided to S2R members experimenting their prototypes into the demonstrator, and any requested modification to the demonstrator, as performed in T2.3.

Integration Layer Services (öffnet in neuem Fenster)

The integration layer services logging authentication authorization and basic persistence

Integration Layer API (öffnet in neuem Fenster)

The integration layer API and its implementation with functions to set and get data through the Integration Layer

Rail Business services software and external services analysis and requirements (öffnet in neuem Fenster)

Report including the analysis and the requirements of Rail Business services software and external services performed during the first phase of T5 18

Design document (öffnet in neuem Fenster)

Integration Layer High level Design document with a coverage matrix according to In2Rail requirements

Report on system architecture (öffnet in neuem Fenster)

This report will illustrate the overall system architecture as reported during technical coordination activities of T21 and alignment with other linked S2R projects of T22 A draft version will be available at M7 to help the work of the other WPs and S2R linked projects

Test programme for the validation of Integration Layer for Traffic Management System demonstrator (öffnet in neuem Fenster)

Report on test planning including details on scenarios scheduled activities equipment configuration required partners required evaluation criteria and performance indicators the programme relates to further activities in T72 and T73 A preliminary and partial version will be produced and used internally by the consortium for the first validation stage due at M20

Report on technical coordination of the project and on project management activities linked to TD2.9 and CCA WA4.2 (öffnet in neuem Fenster)

This report will include the outcomes of the technical coordination of the project the project management activities related to the alignment with linked S2R projects of TD29 and CCA WA42 as performed during T21 and T22

Code and Configuration Generator, including source code (open source), configuration file, and documentation (öffnet in neuem Fenster)

A report describes the Code Configuration generator software developed in T65 The software with its source code configuration file and documentation is provided

Hardware Component Specifications for IL, AF and Operator Workstations (öffnet in neuem Fenster)

This report will include the outcomes of SW/HW requirements analysis, performed in the T3.1

Dissemination, communication and exploitation activity report (öffnet in neuem Fenster)

Report summarising all communication dissemination and exploitation activities and their impact T83T85

Database Services (full), and test report (öffnet in neuem Fenster)

This report outcome the results of T64

Report on Data structures and Database definition (öffnet in neuem Fenster)

This report outcome the results of T63 The derivation link between CDM content and Database instantiation is its core part

Data Requirements for CDM definition and Database configuration (öffnet in neuem Fenster)

D61 will consist in data description for CDM definition and associated Quality of Service requirements for database configuration

Testing and validation of Integration Layer (öffnet in neuem Fenster)

Demonstration activities that will be carried out for validating the Integration Layer solution including all its subsystems and components HW SW and databases the delivery will be also documented through a brief report

Veröffentlichungen

Projekt Shift2Rail OPTIMA – vývoj komunikační platformy pro řízení provozu (S2R OPTIMA Project – development of communication platform for traffic management)

Autoren: Přemysl Šrámek, Roman Štěrba
Veröffentlicht in: Vědeckotechnický sborník Správy železnic, státní organizace č. 2/2020 (Scientific and technical proceedings of SZCZ), Ausgabe February 2020, 2020, Seite(n) 40-46, ISSN 2694-9172
Herausgeber: Sprava zeleznic, statni organizace

Novel Approach for Validation of Innovative Modules for Railway Traffic Management Systems in a Virtual Environment (öffnet in neuem Fenster)

Autoren: Jin Liu, Cristian Ulianov, Paul Hyde, Anna Lina Ruscelli, Gabriele Cecchetti
Veröffentlicht in: Proceeding of Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit. 2022;236(2):139-148., Ausgabe August 26, 2021, 2021, ISSN 2041-3017
Herausgeber: SAGE Publications Ltd
DOI: 10.1177/09544097211041879

Formalization and processing of data requirements for the development of next generation railway traffic management systems (öffnet in neuem Fenster)

Autoren: A. Magnien, G. Cecchetti, A. L. Ruscelli, P. Hyde, J. Liu, and S. Wegele
Veröffentlicht in: In Proceedings of 4th International Conference on Reliability, Safety and Security of Railway Systems (RSSRail), Lecture Notes in Computer Science, volume 13294, June 2022, Ausgabe 1 - 2 June 2022, 2022, Seite(n) 832–839, ISBN 978-3-031-05814-1
Herausgeber: Springer Verlag
DOI: 10.1007/978-3-031-05814-1_3

Virtual Environments; a solution for testing novel applications for railway traffic management systems

Autoren: Jin Liu, Cristian Ulianov, Paul Hyde, Gabriele Cecchetti
Veröffentlicht in: High Speed Rail Education Interchange (HSREI) Conference, Ausgabe 14-16 December 2020, 2020
Herausgeber: University of Birmingham

Toward new generation railway Traffic Management Systems: the contribution of the OPTIMA project

Autoren: G. Cecchetti, A. L. Ruscelli, C. Ulianov, P. Hyde, J. Liu, A. Magnien, M. Tavac, M. Duracik, L. Oneto, and J. Bertolin
Veröffentlicht in: In Proceedings of Transport Research Arena TRA 2022, Transportation Research Procedia, November 2022, Ausgabe 14-17 November 2022, 2022
Herausgeber: Elsevier Transportation Research Procedia

Communication platform for testing of novel technologies for railway traffic management systems

Autoren: G. Cecchetti, C. Ulianov, A. L. Ruscelli, J. Padilla, F. Manzoni, E. Moreno, A. Magnien, R. Canepa, S. Petralli, and J. Bertolin
Veröffentlicht in: In Proceedings of 13th World Congress on Railway Research (WCRR), June 2022, Ausgabe 6-10 June 2022, 2022
Herausgeber: SPARK (RSBB)

Communication platform concept for virtual testing of novel applications for railway traffic management systems (öffnet in neuem Fenster)

Autoren: Gabriele Cecchetti, Anna Lina Ruscelli, Piero Castoldi, Cristian Ulianov, Paul Hyde, Luca Oneto, Peter Márton
Veröffentlicht in: Transport Research Procedia, Ausgabe March 11, 2022, 2021
Herausgeber: Elsevier
DOI: 10.1016/j.trpro.2022.02.103

Suche nach OpenAIRE-Daten ...

Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten

Es liegen keine Ergebnisse vor

Mein Booklet 0 0