CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.
Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.
Leistungen
Report on the evaluation of the main KPIs for the three demo sites
Technologies benefit impact in terms of emissions (Task 6.1) (öffnet in neuem Fenster)Preliminary emission saving analysis of TPs if compared with fossilbased HC systems T61
Quality Assurance Plan (Task 1.1) (öffnet in neuem Fenster)A plan for project quality risk innovation and gender equality management Will be revised during the project lifetime when needed At least every 6 months
Dissemination strategy and results (Task 7.2) (öffnet in neuem Fenster)Report including the dissemination activities carried out towards HAPPENING relevant industrial sectors
System design-Italian demo (Task 4.2) (öffnet in neuem Fenster)specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42
Ethic and gender issues consideration report (Task 1.3) (öffnet in neuem Fenster)Report for assessing the ethic and gender issues related to the project
Techno economic assessment - Italian demo (Task 4.4) (öffnet in neuem Fenster)assessment of the techno-economic results corresponding to the whole demonstration process (T4.4)
Measurement and Verification (M&V) Plan of Happening system (Task 5.1) (öffnet in neuem Fenster)Definition of M&V plan for HAPPENING system
Project Management Plan (Task 1.1) (öffnet in neuem Fenster)plan containing a Gantt chart and work breakdown structure including a schedule per task with responsible partners use of resources related subtasks related deliverables and dependencies to other tasks
Report on current standardization and non-technical barriers for HAPPENING replication (Task 6.4) (öffnet in neuem Fenster)Analysis of standards to be compliant to and non-technical barriers to be overcome for a prompt marketability for TPs and technologies (T6.4)
System design-Spanish demo (Task 4.2) (öffnet in neuem Fenster)specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42
Monitoring methodology implementation in Austria (Task 3.2) (öffnet in neuem Fenster)Description of the transversal data monitoring methodology applied in the Austrian demo
Techno economic assessment - Spanish demo (Task 4.4) (öffnet in neuem Fenster)assessment of the techno-economic results corresponding to the whole demonstration process (T4.4)
Energy performance Guarantee planning & implementation guideline (Task 5.1) (öffnet in neuem Fenster)Development of energy performance guarantee planning and implementation guideline
End-user requirements and building constraints-Italian demo (Task 4.1) (öffnet in neuem Fenster)Analysis of the current status of the demo building and definition of boundary conditions T41
Business and Plan involving social/market aspects (Task 6.1 & 6.2) (öffnet in neuem Fenster)Business value proposition of the TPs and technologies also including social and marketing aspects to foster H&C renovation (T6.1 & T6.2)
Communication strategy and results of the first activities (Task 7.1) (öffnet in neuem Fenster)Report including the definition of the Communication methodology and approach to reach the different target groups
Techno economic assessment - Austrian demo (Task 4.4) (öffnet in neuem Fenster)assessment of the techno-economic results corresponding to the whole demonstration process (T4.4)
Quality assurance analysis of HAPPENING system (Task 5.2) (öffnet in neuem Fenster)Energy performance of the HAPPENING thermal system verification and analysis.
Energy storage modelling and capacity optimization (Task 2.2 - Subtask 2.2.3) (öffnet in neuem Fenster)detailed modelling of suitable energy storage for the system focused on TES and resulting in optimized sizing
Technologies social and market acceptance (Task 6.1) (öffnet in neuem Fenster)Analysis of the current level of acceptance and social awareness of innovative HAPPENING concept T61
HAPPENING dissemination and communication work and results (Task 7.3) (öffnet in neuem Fenster)Information will be gathered about the dissemination and communication activities carried out ant the obtained measurable results
HAPPENING dissemination and communication work and results 2 (Task 7.3) (öffnet in neuem Fenster)Information will be gathered about the dissemination and communication activities carried out ant the obtained measurable results (update)
Monitoring concept definition of HAPPENING system (Task 3.1) (öffnet in neuem Fenster)Report including the definition of the KPIs presentation of summarised master data general and individual monitoring concepts
Results of numerical analysis of HAPPENING system performance (Task 2.3) (öffnet in neuem Fenster)assessment of general applicability of HAPPENING system into various conditions
End-user requirements and building constraints-Austrian demo (Task 4.1) (öffnet in neuem Fenster)Analysis of the current status of the demo building and definition of boundary conditions T41
HAPPENING system design guideline (Task 5.3) (öffnet in neuem Fenster)Design guideline development for HAPPENING system
Technical manuals and instructions (Task 5.4) (öffnet in neuem Fenster)Technical manuals and instructions, report.
End-user requirements and building constraints-Spanish demo (Task 4.1) (öffnet in neuem Fenster)Analysis of the current status of the demo building and definition of boundary conditions T41
Monitoring methodology implementation in Italy (Task 3.2) (öffnet in neuem Fenster)Description of the transversal data monitoring methodology applied in the Italian demo
Monitoring methodology implementation in Spain (Task 3.2) (öffnet in neuem Fenster)Description of the transversal data monitoring methodology applied in the Spanish demo
Review of normative and legislation (Task 2.1 - Subtask 2.1.1) (öffnet in neuem Fenster)assessment of regulatory framework impacting directly on the specifications of the devices involved in the system
System design-Austrian demo (Task 4.2) (öffnet in neuem Fenster)specific system design for the demo site equipment sizing HAPPENING system adjustment to casespecific conditions T42
E-Handbook with guidelines for integration of the solutions in public and private, tertiary and residential buildings (Task 6.3) (öffnet in neuem Fenster)Lessons learnt from the whole project for future replication of the outcomes (T6.3)
Plan for research data handling
Veröffentlichungen
Autoren:
Sarah Noye, Asier Urueña Andreu, Ruben Mulero Martinez, Ricardo Alonso Segade, Angel Carrera Martin
Veröffentlicht in:
Computing in Construction, Proceedings of the 2024 European Conference on Computing in Construction, Ausgabe 5, 2024
Herausgeber:
European Council for Computing in Construction
DOI:
10.35490/ec3.2024.241
Autoren:
Diego Menegon, Matteo Campidelli, Roberto Fedrizzi
Veröffentlicht in:
14th IEA Heat Pump Conference, Ausgabe 761, 2023
Herausgeber:
IEA HPT
Autoren:
Tim Diller, Anton Soppelsa, Himanshu Nagpal, Roberto Fedrizzi, Gregor Henze
Veröffentlicht in:
Optimization and Engineering, Ausgabe 25, 2024, Seite(n) 229-251, ISSN 1389-4420
Herausgeber:
Kluwer Academic Publishers
DOI:
10.1007/s11081-023-09853-5
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor