Skip to main content
Vai all'homepage della Commissione europea (si apre in una nuova finestra)
italiano italiano
CORDIS - Risultati della ricerca dell’UE
CORDIS

Accelerating the decarbonisation of islands’ energy systems

CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.

I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .

Risultati finali

Guidelines on gender dimension (si apre in una nuova finestra)

Report on guidelines to address womens needs as well as mens to enhance understanding of gender issues in the project activities to consider genderspecific research to fill knowledge gaps and to disseminate results in a gendersensitive way

Infopack for citizens engagement (si apre in una nuova finestra)

Report to gather all the activity done in the context of T73 with clear information provided to citizen and gathered from the several workshops done with conclusions of citiziens participation

Replication plan in the island of Orkney (si apre in una nuova finestra)

Replication plan in the island of OrkneyMain focus on the development of plans to adapt ISLANDER solutions to the island in a cost-efficient way. To do so, the island will readily consider and adapt the main outcomes of WP1 to WP7 while adapted to their different local conditions

Digitalisation of the energy system in ISLANDER project (si apre in una nuova finestra)

This deliverable aims to provide the general public with the summary of main results along WP3 work addressed from D3.1 to D3.4

Final report on demo data (si apre in una nuova finestra)

Final report on demo data: report about the operation of demonstration systems during one year during a whole seasonal cycle.

Weather forecasting model (si apre in una nuova finestra)

Report on how module will optimally combine the extensive forecasting data provided by main weather forecast model providers such as ARPEGE and GFS to the island of Borkum so the best possible accuracy is achieved

Demand Response app user guide (si apre in una nuova finestra)

Report about the development of the consumers app for demand response It will be based in gamification approaches it will follow maximum usability and userfriendliness guidelines and will be provided for iOS and Android operating systems

Public Briefing Note: operational tests outcomes (si apre in una nuova finestra)

Public version of D6.4

Replication plan in the islands of Lefkada (si apre in una nuova finestra)

Replication plan in the islands of Lefkada.Main focus on the development of plans to adapt ISLANDER solutions to the island in a cost-efficient way. To do so, the island will readily consider and adapt the main outcomes of WP1 to WP7 while adapted to their different local conditions

Handbook on practical recommendations (si apre in una nuova finestra)

Handbook on practical recommendations gained through the development of the project. It will be complementary to the dissemination materials and will aim at giving all necessary information to ensure future market uptake of solutions developed and tested in the frame of the project. This publication will also contain results from the pilot demonstration assessed within WP6.

High-level view of the overall system and components (si apre in una nuova finestra)

Provide a highlevel view of the overall system including all the material components networks IT systems and interconnections

Public Briefing Note: Technical and user documentation: District heating network (si apre in una nuova finestra)

Public version of D2.7

Analysis of obstacles to innovation (si apre in una nuova finestra)

Analysis of potential risks and a study of technological, economic and legal barriers. Social challenges related to public acceptance, political will also be considered.

Report on the consumer engagement actions (si apre in una nuova finestra)

Report on the consumer engagement actions Summary of all measures developed towards the engagement of consumers Includes the description of the rationale supporting the actions the estimated impacts and the way they are implemented

Roadmap and Business Plan for the ISLANDER Energy Comunity (si apre in una nuova finestra)

Description of the process developed within the whole WP7: expert inputs presented during workshops, inputs from citizens, barriers and potentials identified, revised business plan and an outlook to the future of the REC. This report will be shared with relevant stakeholders and in particular with the follower islands.

Islander short video (si apre in una nuova finestra)

Islander short video to promote project identity to a broad interested public and increase the project impact.

Open-source tool for the optimal design of islands’ energy systems (si apre in una nuova finestra)

Development of an open-source tool embedding a general model of ISLANDER DER+HES solutions to be presented through a friendly interface.

Integration test plan (si apre in una nuova finestra)

Integration test plan to ensure that all equipment and systems involved are integrated optimally and reliably in the smart IT platform

Individual energy demand forecast models (si apre in una nuova finestra)

Development of models to forecast the energy demand profiles of the consumers based on their attributes and their energy consumption behavior

Optimal design of the energy grid (si apre in una nuova finestra)

This deliverable will pose and solve the mathematical optimisation problem The objective is to obtain the final optimal set of design parameter for every DER and HES system and grid couplings to be deployed in the island This final design will refine the preliminary design calculated during the preparation of the proposal

Public Briefing Note - Technical and user documentation: RESS household solutions (si apre in una nuova finestra)

Public version of D2.4

Set of applicable local and national regulations (si apre in una nuova finestra)

Stablish the guideleines for an effective deployment while fulfilling all the national and local regulations which apply in the case of Borkum

Public Briefing Note: Technical and user documentation: Ultracaps + Li-ion storage system (si apre in una nuova finestra)

Public version of D2.3

Communication and dissemination plans (si apre in una nuova finestra)

First draft of the communication and dissemination plans.This plan will describe the targeted dissemination and communication activities and distribution channels for the project as well as the directed impacts. The activities within this task will entail communications and dissemination (calendar of potential conferences, fairs, and other events to be attended, planned publications and press releases etc.) as well as a list of relevant stakeholders and networks/projects to be approached, updated every 6 months through creative sessions during partner meetings and regular telephone conferences. In addition, this task will also keep track of all communications and dissemination activities effectively implemented during the project, considering present European energy legislations.

Replication plan in the islands of Skopelos (si apre in una nuova finestra)

Replication plan in the islands of Skopelos.Main focus on the development of plans to adapt ISLANDER solutions to the island in a cost-efficient way. To do so, the island will readily consider and adapt the main outcomes of WP1 to WP7 while adapted to their different local conditions

Report on the showroom (si apre in una nuova finestra)

Report on the showroom constucted and equiped to showcase the management of the energy infrastructure in the holistic approach proposed in the project

Action plan for citizen engagement process (si apre in una nuova finestra)

Report about the Internal workshop expected at M12 and the basis for the creation of a REC in Borkum Action plan for citizen engagement process

Public briefing note on scheduling services (si apre in una nuova finestra)

Public version of D53

Operational test plan (si apre in una nuova finestra)

Operational test plan with the objective to ensure that all the generation and storage systems operate readily and optimally.

Public Briefing Note on Networks integration functionalities and interface design (si apre in una nuova finestra)

Public version of D3.4. Deliverable presents the main interfacing steps to the general public

Macroscopic energy supply and demand forecasting models (si apre in una nuova finestra)

Report about the module that delivers the supply and demand of the network assets as a whole This will complement the individual forecasting modules by providing additional estimation measures taking advantage of the accuracy gains due to the aggregation of assets

SSH report on demand response and consumer behaviour (si apre in una nuova finestra)

Report to improve the assessment of and response to the complex issues raised by demand response and consumer engagement in the operation of energy grids from multiple angles economic and business models human behaviour and choices demographic realities and trends and other potential ethical considerations

Public Briefing Note: Documentation on upgrading conducted in the street lighting network (si apre in una nuova finestra)

Public version of D2.8

Individual renewable supply generation forecast models (si apre in una nuova finestra)

Report on how module will deliver estimations about the production of the renewable assets within the grid

Replication plan in Shetland and Western islands (si apre in una nuova finestra)

Replication plan in Shetland and Western islandsThe Follower islands’ replication plans (D8.1 to D8.3) will be complemented with further plans of ISLANDER solutions to the surrounding archipelagos. Specifically, the work will follow a similar structure of task 8.3 although providing a more general overview of the main potentials this time.

Public Briefing Note:Technical and user documentation: H2-based storage system (si apre in una nuova finestra)

Public version of D2.2

ISLANDER corporate identity toolkit (si apre in una nuova finestra)

The Islander communication toolkit will contain all documents and other elements required by partners to represent the project appropriately to the public

Energy price forecasting model (si apre in una nuova finestra)

Report on the development of an artificial neural network to provide the estimation of the energy costs considering the hour of the day the day of the week the season and the weather conditions

Replication plan in Kvarner Gulf islands (si apre in una nuova finestra)

Replication plan in Kvarner Gulf islands.The Follower islands’ replication plans (D8.1 to D8.3) will be complemented with further plans of ISLANDER solutions to the surrounding archipelagos. Specifically, the work will follow a similar structure of task 8.3 although providing a more general overview of the main potentials this time.

Replication plan in Ionian and Sporades Greek archipelagos (si apre in una nuova finestra)

Replication plan in Ionian and Sporades Greek archipelagos.The Follower islands’ replication plans (D8.1 to D8.3) will be complemented with further plans of ISLANDER solutions to the surrounding archipelagos. Specifically, the work will follow a similar structure of task 8.3 although providing a more general overview of the main potentials this time.

ISLANDER web presence strategy (si apre in una nuova finestra)

ISLANDER web presence strategy with all the updates done in the context of T9.5 such as webiste creation, social media, links to major websites, contact from visitors questions... This report will sumarize the activity done along the whole lifespan of the project.

Replication plan in the island of Cres (si apre in una nuova finestra)

Replication plan in the island of CresMain focus on the development of plans to adapt ISLANDER solutions to the island in a cost-efficient way. To do so, the island will readily consider and adapt the main outcomes of WP1 to WP7 while adapted to their different local conditions

ISLANDER 8-monthly newsletters (si apre in una nuova finestra)

ISLANDER 8-monthly newsletters: Newsletters will be published on project’s-, partners’ and networks’ websites as well as disseminated through emailing and social networks . This deliverable will gather all the newsltters published along the whole lifespan of the project.

Public Briefing Note: Technical and user documentation: RESS building solution (si apre in una nuova finestra)

Public version of D2.5

Report on press releases (si apre in una nuova finestra)

Report on press releases: A minimum of 4 press releases will be prepared in the course of the project as well as at least 1 after the end of the project, ant this deliverable will gather all the information delivered at different stages of the project.

Public Briefing Note: Technical and user documentation: EV charging station (si apre in una nuova finestra)

Public version of D2.6

Holistic model of the energy grid (si apre in una nuova finestra)

Develop a mathematical model of the energy system of the island to serve as a virtual mockup for performing the optimisation and subsequent simulation and analysis covered by tasks 13

Visibility study for ISLANDER Energy Community (si apre in una nuova finestra)

The economic viability technical viability for safe and efficient operation of the generation assets will be analysed and presented as a feasibility study and exante cost benefit analysis

Pubblicazioni

Improved local weather forecasting using machine learning (si apre in una nuova finestra)

Autori: Guillaume Fischer, Elodie Courtois
Pubblicato in: Open Research Europe, Numero 5, 2025, Pagina/e 271, ISSN 2732-5121
Editore: F1000 Research Ltd
DOI: 10.12688/openreseurope.20255.1

On the Correlation between Pro-Environmental Behavior Self-Reports and Behavioralparadigms (si apre in una nuova finestra)

Autori: Sarah Delcourt, Florian Lange, siegfried dewitte
Pubblicato in: SSRN (Social Science Research Network), 2024
Editore: Elsevier BV
DOI: 10.2139/ssrn.4739550

È in corso la ricerca di dati su OpenAIRE...

Si è verificato un errore durante la ricerca dei dati su OpenAIRE

Nessun risultato disponibile

Il mio fascicolo 0 0