Skip to main content
Weiter zur Homepage der Europäischen Kommission (öffnet in neuem Fenster)
Deutsch de
CORDIS - Forschungsergebnisse der EU
CORDIS
Inhalt archiviert am 2024-05-21

Advanced research magnet systems

Ziel

Description:

A pulsed magnet station will be set up at the SNCMP Toulouse and will be made available to the specific community as a user magnet. The target field is at least 80 T in a 20 mm bore and with 30ms pulse duration. The magnet will be built according to the "coilin/coilex" scheme where two coaxial magnets are energised from different power sources. The outer magnet (coilex) will be wound from copper wire clad with steel and the 14 MJ capacitor banks will energise it, which is available at SNCMP. The inner magnet has to support the full force of the 80T + field, this will be made with very strong wires and optimised internal reinforcement. This will be energised by a 160KJ, 18 KV capacitor banks that will be obtained upgrading the existing transportable bank. The completed magnet system will be tested with critical experiments in order to provide full user access. The technology developed in this project can be transferred to other laboratories, in particular to large installations and thus increase access to research infrastructure.

Project Manager:
Harry Jones, Clarendon Laboratory, Department of Physics, Parks Road, Oxford OX1 3PU, United Kingdom
Tel: +44-1865-272326
Fax: +44-1865-282206
E-Mail: h.jones1@physics.ox.ac.uk

Wissenschaftliches Gebiet (EuroSciVoc)

Dieses Projekt wurde noch nicht bei EuroSciVoc klassifiziert.
Schlagen Sie die Wissenschaftsbereiche vor, die Ihrer Einschätzung nach besonders relevant sind, und helfen Sie uns, unseren Klassifizierungsdienst zu verbessern.

Programm/Programme

Thema/Themen

Aufforderung zur Vorschlagseinreichung

Daten nicht verfügbar

Finanzierungsplan

CSC - Cost-sharing contracts

Koordinator

THE CHANCELLOR, MASTERS AND SCHOLARS OF THE UNIVERSITY OF OXFORD
EU-Beitrag
Keine Daten
Adresse
Parks Road
OX1 3PU OXFORD
Vereinigtes Königreich
Gesamtkosten
Keine Daten

Beteiligte (6)