Skip to main content
Aller à la page d’accueil de la Commission européenne (s’ouvre dans une nouvelle fenêtre)
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary
Contenu archivé le 2024-04-30

High Speed Freight on the European High Speed Railway Network

Objectif

The HISPEEDMIX target is the definition of the main guidelines ruling the freight and passenger management on the existing and future European High Speed Rail Network, taking into account the peculiar aspects related to the medium and long term transport planning. Furthermore, HISPEEDMIX has been proposed as a project to examine two different scenarios for offering freight services on the European High Speed Rail Network:
a) to assess the market requirements for high speed freight traffic and the capability of the existing high speed lines to cope with such a traffic
b) to study the utilisation of the high speed network for traditional freight traffic in mixed traffic conditions.
The overall work plan consists of the following tasks:
1. to perform a market analysis for two scenarios, high speed freight and conventional freight, and to identify the customer needs for high speed market segments
2. to evaluate the impact of the freight train traffic on the RAMS performances on the European High Speed Rail Network
3. to identify the technological constraints related to the implementation of the mixed traffic on infrastructure, nodes and rolling stock
4. to define the maintenance model and the maintenance plan for both scenarios
5. to analyse the operational constraints in terms of traffic, resources and facilities
6. to assess and validate the results by means of a case study (Turin-Lyon segment)
7. to perform the cost benefit analysis
8. to specify the conditions under which the use of the European High Speed Rail Network is feasible and cost effective for high speed and conventional freight traffic and passenger traffic.

Links with other projects, tasks, areas, programmes, policy actions:

The first three WPs, i.e. definition of requirements/methodology definition/rail strategy implementation, are strictly linked
with INTELFRET and EUFRANET projects.
The fourth WP, i.e. system and safety aspects, takes into account the interoperability specifications coming from ERTMS-programme
The fifth WP is linked to the Alpetunnel

Case studies

Turin-Lyon segment

Champ scientifique (EuroSciVoc)

CORDIS classe les projets avec EuroSciVoc, une taxonomie multilingue des domaines scientifiques, grâce à un processus semi-automatique basé sur des techniques TLN. Voir: https://op.europa.eu/en/web/eu-vocabularies/euroscivoc.

Vous devez vous identifier ou vous inscrire pour utiliser cette fonction

Appel à propositions

Data not available

Coordinateur

FERROVIE DELLO STATO - SOCIETA DI TRASPORTI E SERVIZI PER AZIONI
Contribution de l’UE
Aucune donnée
Adresse
Piazzale di Porta San Lorenzo 1
00100 Roma
Italie

Voir sur la carte

Coût total
Aucune donnée

Participants (6)