Cel Recovery of hydro-electric power from an existing drinking-water supply pipeline (LA MURE FRANCE) for sale to Electricite de France.The aim of the project is to exploit the hydraulic energy of an existing drinking water conduit supplying a small community. With a constant discharge capacity throughout the year of 75 L/S and a net head of 143 m, max. output of the hydropower plant is 86 kW. The installation consists of a single jet Pelton turbine for constant flow directly coupled with an asynchronous generator. Operation of plant would be fully automatic. Program(-y) ENG-ENDEMO C - Programme (EEC) of demonstration projects and industrial pilot projects (EEC) in the energy field, 1985-1989 Temat(-y) Data not available Zaproszenie do składania wniosków Data not available System finansowania DEM - Demonstration contracts Koordynator MAIRIE DE LA MURE Wkład UE Brak danych Adres HOTEL DE VILLE 38350 LA MURE Francja Zobacz na mapie Koszt całkowity Brak danych