CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.
I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .
Risultati finali
This deliverable includes the strategy based in communication measures and targeted audiences, but also dissemination and exploitation routes. Associated to Task 8.2
Dissemination, Exploitation & Communication Master Plan (si apre in una nuova finestra)This deliverable includes the strategy based in communication measures and targeted audiences, but also dissemination and exploitation routes. To be revised on M18. Associated to Task 8.2
The report for this task includes a summary of analysis results indicating advantages and disadvantages for different design options of the anchoring types and the connections between the floating breakwater and the FPV array. Based on the technical requirements from D2.2, the fulfillment of these criteria for material properties, anchoring type, cost-effectiveness, compatibility with the arrangement of power distribution cables, and functionality of the connections to the FPV array is evaluated. Associated to tasks 3.3 and 3.4.
Report on ultimate strength capacity of each connection (si apre in una nuova finestra)In this report, the ultimate strength of the criticalComponents (i.e. Mechanical joint and connection systems) of the floating PV system defined in WP3, to check the survivability during extreme scenarios (Storm conditions) will be reported. Associated to Task 6.2
Summary of global system design (si apre in una nuova finestra)Delivered as holistic design documentation for full FPV solution, based on metocean conditions and full system design. Associated with tasks 3.1, 3.2, 3.3, and particularly 2.1-3.4
Design description of internal floating PV components (si apre in una nuova finestra)Delivered as design documentation for adaptation of floating solar panels for extreme conditions, integrated with novel wave breaker technology. Associated with tasks 3.1, 3.4 and to limited extent 3.2 and 3.3
Establishing a technical stakeholders advisory board (si apre in una nuova finestra)The deliverable is signed intentions of relevant stakeholders participating in the SHB. Associated with task 2.4
Use case scenario basis for typical, rough location (si apre in una nuova finestra)In this report, several offshore locations with extreme environmental conditions will be identified and possibility of corrosion and biofouling will be analysed. The worst-case scenarios for a 20 years return period, in accordance with DNV RP 0584 will also be defined. Associated to Task 2.1.
Proof of the breakwater developed with a reduced scale of 1m (wide), 0.5 (heigh) , 2m (length). Associated to task 4.4
Pubblicazioni
Autori:
Upeksha Chathurani Thibbotuwa, Ainhoa Cortés, Andoni Irizar
Pubblicato in:
2023
Editore:
DCIS
Autori:
Joep van der Zanden ,Tim Bunnik ,Ainhoa Cortés ,Virgile Delhaye ,Guillaume Kegelart ,Thomas Pehlke and Balram Panjwani
Pubblicato in:
Energies, Numero 2059, 2024, ISSN 1996-1073
Editore:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en17092059
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile