Buildings Operational stage represents 80% of building’s life-cycle cost of which 50% is consequence of the energy use. Up to 90% of the buildings’ life cycle carbon emissions occur during their operational phase, mainly as consequence of the HVAC, lighting and appliances’ energy use. Therefore, energy and cost saving strategies addressing this building operation phase will have a major impact in the building life cycle cost.
Energy IN TIME (EiT) project goes beyond existing building control techniques, developing an integrated control & operation approach, that will combine state of the art modelling techniques with the development of an innovative simulation-based control technique with the overarching objective of automating the generation of optimal operational plans tailored to the actual building and users requirements. This approach will allow reducing system inefficiencies and contributing to improve building energy efficiency and comfort.
The target for Energy IN TIME solution will be existing non-residential buildings, which present the building typologies that guaranties higher impact and room for improvement due to the variety and quantity of facilities and equipment covered and the operational management model used in them. A control tool will be implemented in the building energy management systems to be automatically and remotely operated. The methodology for the enhancing solution implementation will be defined for existing buildings and for its implementation in new buildings since its initial commissioning.
The Energy IN TIME project work plan is divided into nine work packages: WP1: Requirements & System Architecture; WP2: Simulation Reference Model; WP3: Whole building Intelligent Control System.; WP4: Diagnosis & Continuous Commissioning; WP5: Energy Decision Support Tool. ; WP6: System Integration & Pilot-Scale Validation.; WP7: Demonstration to implement the designed and developed systems; WP8: Dissemination & exploitation; WP9 Coordination.
Dziedzina nauki
Zaproszenie do składania wniosków
FP7-2013-NMP-ENV-EeB
Zobacz inne projekty w ramach tego zaproszenia
System finansowania
CP-IP - Large-scale integrating projectKoordynator
28033 MADRID
Hiszpania
Zobacz na mapie
Uczestnicy (13)
1700-008 Lisboa
Zobacz na mapie
50018 Zaragoza
Zobacz na mapie
T12 CORK
Zobacz na mapie
54052 Nancy Cedex
Zobacz na mapie
77420 Champs Sur Marne
Zobacz na mapie
08005 Barcelona
Zobacz na mapie
030138 Bucuresti
Zobacz na mapie
G20 0SP Glasgow
Zobacz na mapie
Zakończenie uczestnictwa
16121 Genova
Zobacz na mapie
18071 Granada
Zobacz na mapie
T23 Cork
Zobacz na mapie
01650 Vantaa
Zobacz na mapie
16129 Genova Ge
Zobacz na mapie