Skip to main content
European Commission logo print header
Zawartość zarchiwizowana w dniu 2022-12-27

LNG STORAGE IN UNDERGROUND CAVERNS

Cel

To demonstrate the feasibility of an underground cryogenic storage in limestone for liquified gas.

The project is devided in several phases:

1. Laboratory test in limestone to appreciate the feasibility of the test plant:

2. To design, build and operate a test gallery in limestone. The 5 000 m3 test gallery is to be built in limestone in lavera near marseilles:

3. To interprete the results of the test gallery and conclude on the feasibility of an industrial plant in limestone.

RESULTS:

The test laboratory allowed to include that it is theoretically possible to store lpg and lng in limestone, but a test plant is needed to confirm this conclusion.

Temat(-y)

Data not available

Zaproszenie do składania wniosków

Data not available

System finansowania

Data not available

Koordynator

Géostock
Wkład UE
Brak danych
Adres
Tour Aurore
92080 Paris la Défense
Francja

Zobacz na mapie

Koszt całkowity
Brak danych