Cel To demonstrate the feasibility of an underground cryogenic storage in limestone for liquified gas. The project is devided in several phases: 1. Laboratory test in limestone to appreciate the feasibility of the test plant: 2. To design, build and operate a test gallery in limestone. The 5 000 m3 test gallery is to be built in limestone in lavera near marseilles: 3. To interprete the results of the test gallery and conclude on the feasibility of an industrial plant in limestone. RESULTS: The test laboratory allowed to include that it is theoretically possible to store lpg and lng in limestone, but a test plant is needed to confirm this conclusion. Program(-y) ENG-HYDROCARB 1C - Programme (EEC) of Community projects in the hydrocarbons sector, 1973-1985 Temat(-y) Data not available Zaproszenie do składania wniosków Data not available System finansowania Data not available Koordynator Géostock Wkład UE Brak danych Adres Tour Aurore 92080 Paris la Défense Francja Zobacz na mapie Koszt całkowity Brak danych