CORDIS oferuje możliwość skorzystania z odnośników do publicznie dostępnych publikacji i rezultatów projektów realizowanych w ramach programów ramowych HORYZONT.
Odnośniki do rezultatów i publikacji związanych z poszczególnymi projektami 7PR, a także odnośniki do niektórych konkretnych kategorii wyników, takich jak zbiory danych i oprogramowanie, są dynamicznie pobierane z systemu OpenAIRE .
Rezultaty
Report summarising experiments in Task 4.1-4.4 including methods, results, and data except for results that will be disseminated in other ways (papers or patents). This includes reactor design, catalyst performance, modelling of plasma reaction and the effect of plasma on sorption material stability and NH3 adsorption. Related to KPI6.
Summary of experiments WP3 (methods, results, data) (odnośnik otworzy się w nowym oknie)Report summarising experiments in Task 3.1-3.2 including methods, results, and data except for results that will be disseminated in other ways (papers or patents). This includes study of zeolites NH3 capacity, kinetic behaviour, and cycle capacity. Related to KPI5.
Economic assessment of full scale DARE2X technology for H2 storage by its conversion into NH3 at low-pressure and temperature (Initial assessment) (odnośnik otworzy się w nowym oknie)The initial economic assessment will be a Life cycle costing analysis with focus on material selection and process options. The goal is to guide the project towards economic sound options.
Summary of experiments WP2 (methods, results, data) (odnośnik otworzy się w nowym oknie)Report summarising experiments in Task 2.1-2.5 including methods, results, and data except for results that will be disseminated in other ways (papers or patents). This includes, synthesis of catalyst, comparison with theoretical models, effects of promotors, catalyst synthesis incorporated on sorption material and upscaling of synthesis. Related to KPI1-KPI4.
Dissemination and Communication Plan - Version 2 (odnośnik otworzy się w nowym oknie)The plan will define all direct and indirect stakeholders with the contribution of the partners, proper dissemination channel and tools tailored for each target group to transfer key-identified messages about the project objectives, activities, benefits, and impacts. A timeline will also be established for each communication activity. The plan will identify Qualitative and Quantitative Performance Indicators (i.e., webpage visitors, e-newsletter recipients, social network followers, events participants profiles. results from events evaluation etc.) for the distribution channels to constantly monitor and measure dissemination and communication activities. This is an updated plan based on D7.
Dissemination and Communication Plan - Version 1 (odnośnik otworzy się w nowym oknie)A first version of the exploitation strategy will be made and used to form the Dissemination and Communication plan.The Dissemination and Communication plan will define all direct and indirect stakeholders with the contribution of the partners, proper dissemination channel and tools tailored for each target group to transfer key-identified messages about the project objectives, activities, benefits, and impacts. A timeline will also be established for each communication activity. The plan will identify Qualitative and Quantitative Performance Indicators (i.e., webpage visitors, e-newsletter recipients, social network followers, events participants profiles. results from events evaluation etc.) for the distribution channels to constantly monitor and measure dissemination and communication activities.
Report on non-thermal plasma reactor design and optimal parameters (odnośnik otworzy się w nowym oknie)Report on plasma reactor design and optimal parameters for ammonia synthesis. Plasma reactor design benchmarked to other non-thermal plasma configurations and alternative NH3 synthesis processes. Related to Task 4.1-4.2 and KPI6.
Environmental assessment of full scale DARE2X technology for H2 storage by its conversion into NH3 at low-pressure and temperature (Initial assessment) (odnośnik otworzy się w nowym oknie)Initial life cycle analysis comparing different material and process options in WP2-4. This initial LCA is focused on materials selection and process parameters to guide the project towards the most sustainable option.
Report on rational catalyst design and results of screening study (odnośnik otworzy się w nowym oknie)Report showing results of theoretical screening study of catalyst (Task 2.2). This includes description of the DFT model, comparison with experimental data (Task 2.1) and suggestion of potential catalyst candidates with higher activity and less critical raw materials. Related to KPI1 and KPI2.
TYPE: ETHICSFirst version of Ethics protocol. Will be revised in D1.5 (M24)
Ethics Protocol (Final Version) (odnośnik otworzy się w nowym oknie)Type: ETHICSFinal version of Ethics Protocol for the project.
Deliver a sorption unit for two stage process (Task 5.2). This should be able adsorb and desorb NH3 using temperature and pressure control.
Publikacje
Autorzy:
T. Kristenssen, B. Rolim, C. Hulteberg
Opublikowane w:
2023
Wydawca:
EuropaCat
Wyszukiwanie danych OpenAIRE...
Podczas wyszukiwania danych OpenAIRE wystąpił błąd
Brak wyników