CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.
I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .
Risultati finali
Online Community customised, with Community strategy place.
Design and implementation of required sub- models, exposures and interface (si apre in una nuova finestra)This deliverable will focus on defining the AAS requirements, submodels for the verticals, as well as designing/im-plementing required exposures and interfaces that will be leveraged to populate the AAS submodels.
D2.2 provides a requirements analysis regarding thedifferent applications demands for the interface devices created in Task2.2 and the definition of potential use cases.The contents of the deliverable will be further used in Task2.2 and Task2.3.
Forward looking use cases, their requirements and KPIs/KVIs (si apre in una nuova finestra)The public deliverable will contain a detailed description of the use cases, their requirements and the defined andemployed KPIs and KVIs. Additionally, the results achieved through the KPI/KVI-based assessment will be in-cluded. Furthermore the evaluation methodology will be published enabling the KPI/KVI-based assessment of dif-ferent use cases. This deliverable also represents the first milestone of TARGET-X.
Roadmap for the 5G/6G empowered deconstruction robotic platform (si apre in una nuova finestra)D5.1 will provide a detailedtechnical plan for the 5G/6G empowered robotic platform with specifications about the functionality of the moduleand the network infrastructures.
1st Call Announcement and Guide for Applicants (si apre in una nuova finestra)Report containing the information and the requirements for the applicants to the 1st open call.
2nd Call Announcement and Guide for Applicants (si apre in una nuova finestra)Report containing the information and the requirements for the applicants to the 2nd open call.
Integrated pilot setup (si apre in una nuova finestra)This deliverable describes the detailed testbed setup, including the 5G network,the edge computing facilities and a description of the use case scenarios and requirements. A set of KPIs will bedefined for the automotive use cases. D4.1 will also document the system integrations performed necessary to beable to deploy and validate the use cases.
Pilot implementation plan (si apre in una nuova finestra)The pilot implementation plan will be provided.
Report on system design options and 5G/6G setup for tracking, monitoring, and inline quality assurance in manufacturing (si apre in una nuova finestra)This deliverable will contain a detailed description of the test use case systems designed and developedin Task 2.4 and Task 2.5. This includes the requirements analysis and possible solutions to enable the tradeoffrequired to ensure flexibility and good performance of the prototypes.
Energy data and automation architecture report (Draft) (si apre in una nuova finestra)Description of architecture from field to edge device and cloud platform. Iterative document, draft/final.
Website about the project
Pubblicazioni
Autori:
Chu Han Wu, Marit Zöcklein, Sigrid Brell-Cokcan
Pubblicato in:
Proceedings of the International Symposium on Automation and Robotics in Construction (IAARC), Proceedings of the 41st International Symposium on Automation and Robotics in Construction, 2024
Editore:
International Association for Automation and Robotics in Construction (IAARC)
DOI:
10.22260/ISARC2024/0022
Autori:
Manuel Pitz, Felix Wege, Niklas Eiling, Steffen Vogel, Vincent Bareis, Antonello Monti
Pubblicato in:
2024 Open Source Modelling and Simulation of Energy Systems (OSMSES), 2024
Editore:
IEEE
DOI:
10.1109/OSMSES62085.2024.10668996
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile