Rezultaty
Online Community customised, with Community strategy place.
Design and implementation of required sub- models, exposures and interfaceThis deliverable will focus on defining the AAS requirements, submodels for the verticals, as well as designing/im-plementing required exposures and interfaces that will be leveraged to populate the AAS submodels.
D2.2 provides a requirements analysis regarding thedifferent applications demands for the interface devices created in Task2.2 and the definition of potential use cases.The contents of the deliverable will be further used in Task2.2 and Task2.3.
Forward looking use cases, their requirements and KPIs/KVIsThe public deliverable will contain a detailed description of the use cases, their requirements and the defined andemployed KPIs and KVIs. Additionally, the results achieved through the KPI/KVI-based assessment will be in-cluded. Furthermore the evaluation methodology will be published enabling the KPI/KVI-based assessment of dif-ferent use cases. This deliverable also represents the first milestone of TARGET-X.
Roadmap for the 5G/6G empowered deconstruction robotic platformD5.1 will provide a detailedtechnical plan for the 5G/6G empowered robotic platform with specifications about the functionality of the moduleand the network infrastructures.
1st Call Announcement and Guide for ApplicantsReport containing the information and the requirements for the applicants to the 1st open call.
2nd Call Announcement and Guide for ApplicantsReport containing the information and the requirements for the applicants to the 2nd open call.
Integrated pilot setupThis deliverable describes the detailed testbed setup, including the 5G network,the edge computing facilities and a description of the use case scenarios and requirements. A set of KPIs will bedefined for the automotive use cases. D4.1 will also document the system integrations performed necessary to beable to deploy and validate the use cases.
Pilot implementation planThe pilot implementation plan will be provided.
Report on system design options and 5G/6G setup for tracking, monitoring, and inline quality assurance in manufacturingThis deliverable will contain a detailed description of the test use case systems designed and developedin Task 2.4 and Task 2.5. This includes the requirements analysis and possible solutions to enable the tradeoffrequired to ensure flexibility and good performance of the prototypes.
Energy data and automation architecture report (Draft)Description of architecture from field to edge device and cloud platform. Iterative document, draft/final.
Website about the project
Wyszukiwanie danych OpenAIRE...
Podczas wyszukiwania danych OpenAIRE wystąpił błąd
Brak wyników