Wyniki projektu
CORDIS oferuje możliwość skorzystania z odnośników do publicznie dostępnych publikacji i rezultatów projektów realizowanych w ramach programów ramowych HORYZONT.
Odnośniki do rezultatów i publikacji związanych z poszczególnymi projektami 7PR, a także odnośniki do niektórych konkretnych kategorii wyników, takich jak zbiory danych i oprogramowanie, są dynamicznie pobierane z systemu OpenAIRE .
Rezultaty
This document will report the dissemination, communication and exploitation activities performed during the final 18 months, the results achieved and the exploitation plan for the period after the end of the project. Standardisation activities will be documented and the effort towards the creation of a European technological value chain for storage will be documented in terms of concrete activities during this final project period. Finally, the clustering activities with other projects and Initiatives of the EC will be documented. Success Criteria: The document should report the achieved results. (Tasks 6.1, 6.2, 6.3, 6.4, 6.5, 6.6)
i-STENTORE Demo 4: Cooperative Modular Multi Hybrid ESS for E-mobility services (Italy) - Operation, Execution and Documentation (full demo operation) (odnośnik otworzy się w nowym oknie)This deliverable will document all details surrounding the operation of Demo 4 during the full-demo operation phase and will provide all the necessary documentation.General and technical details about the Demo 4 deployment, the on-site details, the scenarios, the integration and the full-scale operation will be documented in terms of an update to D4.2. More concrete results will be presented. Success Criteria: Availability of the report in terms of the full-demo operation scope. (Task 4.6).
i-STENTORE Living Lab - Operation, execution and documentation (full demo operation) (odnośnik otworzy się w nowym oknie)This deliverable will document all details surrounding the operation of the Living-Lab during the full-demo operation phase and will provide all the necessary documentation.General and technical details about the living-lab deployment, the on-site details, the scenarios, the integration and the full-scale operation will be documented in terms of an update to D4.2. More concrete results will be presented. Success Criteria: Availability of the report in terms of the full-demo operation scope. (Task 4.2).
Commercialisation roadmap (odnośnik otworzy się w nowym oknie)This deliverable should include an elaborate plan towards achieving wide commercialization. Taking into account the findings of WP5 and the already established activities in WP6 this deliverable will explore ways towards identifying customers for the future commercial solution of i-STENTORE. Opportunities in markets will be identified, as well as target customers. Success Criteria: A detailed roadmap with specific goals and KPIs. (Task 6.3)
i-STENTORE Demo 2: Pump hydro Storage system combined with BESSs (Portugal) - Operation, execution and Documentation (full demo operation) (odnośnik otworzy się w nowym oknie)This deliverable will document all details surrounding the operation of Demo 2 during the full-demo operation phase and will provide all the necessary documentation.General and technical details about the Demo 2 deployment, the on-site details, the scenarios, the integration and the full-scale operation will be documented in terms of an update to D4.2. More concrete results will be presented. Success Criteria: Availability of the report in terms of the full-demo operation scope. (Task 4.4).
i-STENTORE services co-creation, business models, functional specifications and Reference Architecture (final version) (odnośnik otworzy się w nowym oknie)This deliverable will update Deliverable 2.3 after the completion of the Full-demo operation phase, taking into account the lessons learnt and the feedback received during this second period. Success Criteria: Update of the definition of services and design of the Architecture. (Tasks 2.3, 2.5, 2.6).
i-STENTORE evaluation results and lessons learnt, replication / scalability roadmap, multi-dimensional impact assessment, regulation briefing (2nd version) (odnośnik otworzy się w nowym oknie)This deliverable will include the detailed evaluation of the results coming from the demos and the operation of the living lab, during the full demo operation phase and will update the contents of D5.1. The deliverable will identify important lessons learnt and will perform an update of the replicability and scalability roadmap for the whole project. The impact assessment of D5.1 will also be updated and more concrete recommendations towards regulators and policy makers will be defined. Success Criteria: Availability of the 2nd version of the document referring to the full-demo operation phase. (Tasks 5.1, 5.2, 5.3, 5.4, 5.5, 5.6)
i-STENTORE Demo 1: Molten Glass thermal storage for an increased uptake of renewable Energy (Slovenia) - Operation, execution and documentation (full demo operation) (odnośnik otworzy się w nowym oknie)This deliverable will document all details surrounding the operation of Demo 1 during the full-demo operation phase and will provide all the necessary documentation.General and technical details about the Demo 1 deployment, the on-site details, the scenarios, the integration and the full-scale operation will be documented in terms of an update to D4.2. More concrete results will be presented. Success Criteria: Availability of the report in terms of the full-demo operation scope. (Task 4.3)
i-STENTORE Living Lab's operation and demos' execution documentation (large-scale) (odnośnik otworzy się w nowym oknie)This deliverable will document all details surrounding the operation of the Living-Lab and the project pilots during the Large-scale phase and will provide all the necessary documentation.General and technical details about the demo deployment, the on-site details, the scenarios, the integration and the large-sclae operation will be documented in terms of an update to D4.3. Final Results from each pilot will be presented. Success Criteria: Availability of the report in terms of the large-scale operation scope. (Tasks 4.2, 4.3, 4.4, 4.5, 4.6, 4.7).
i-STENTORE evaluation results and lessons learnt, replication / scalability roadmap, multi-dimensional impact assessment, regulation briefing (final version) (odnośnik otworzy się w nowym oknie)This deliverable will include the detailed evaluation of the results coming from the demos and the operation of the living lab, during the large scale operation phase, following the testing of the second technological release and will update the contents of D5.2. The deliverable will identify important lessons learnt and will perform an update of the replicability and scalability roadmap for the whole project. The impact assessment of D5.2 will also be updated and final recommendations towards regulators and policy makers will be defined. Success Criteria: Availability of the final version of the document referring to the large-scale phase. (Tasks 5.1, 5.2, 5.3, 5.4, 5.5, 5.6)
i-STENTORE Demo 5: Agri-PV farm with Energy Storage Capabilities (Luxembourg) - Operation, Execution and Documentation (full demo operation) (odnośnik otworzy się w nowym oknie)This deliverable will document all details surrounding the operation of Demo 5 during the full-demo operation phase and will provide all the necessary documentation.General and technical details about the Demo 5 deployment, the on-site details, the scenarios, the integration and the full-scale operation will be documented in terms of an update to D4.2. More concrete results will be presented. Success Criteria: Availability of the report in terms of the full-demo operation scope. (Task 4.7).
i-STENTORE Demo 3: Virtual Energy Storage System for Renewable Energy Integration (Spain) - Operation, Execution and Documentation (full demo operation) (odnośnik otworzy się w nowym oknie)This deliverable will document all details surrounding the operation of Demo 3 during the full-demo operation phase and will provide all the necessary documentation.General and technical details about the Demo 3 deployment, the on-site details, the scenarios, the integration and the full-scale operation will be documented in terms of an update to D4.2. More concrete results will be presented. Success Criteria: Availability of the report in terms of the full-demo operation scope. (Task 4.5).
This deliverable will include the description of the updated more mature and final version of all horizontal and vertical tools of i-STENTORE, which will include the full set of functionalities and will facilitate all i-STENTORE use-cases as the project and the pilots mature with time. This deliverable will also present the final version of the integrated digital i-STENTORE platform. Success Criteria: Operational versions of all vertical and horizontal tools and successful integration into the i-STENTORE digital platform (full functionality - Final Release). (Tasks 3.2, 3.3, 3.4, 3.5, 3.6, 3.7)
i-STENTORE energy storage technologies evolution (final technology release) (odnośnik otworzy się w nowym oknie)This deliverable will perform an update of the D3.2 making the necessary changes and presenting the final version of the storage technologies to be deployed i i-STENTORE based on the progress of the full-demo operation phase and the increased maturity from the side of the pilots. Success Criteria: The availability of the document (Task 3.1)
i-STENTORE digital ecosystem (digital tools and platforms, virtual power control, data governance, flexibility services) (2nd technology release) (odnośnik otworzy się w nowym oknie)This deliverable will include a description of an updated more mature version of all horizontal and vertical tools of i-STENTORE, which will include more functionalities and will facilitate more use-cases as the project and the pilots mature with time. This deliverable will also present the second more advanced version of the integrated digital i-STENTORE platform. Success Criteria: Operational versions of all vertical and horizontal tools and successful integration into the i-STENTORE digital platform (increased functionality - 2nd Release). (Tasks 3.2, 3.3, 3.4, 3.5, 3.6, 3.7)
Publikacje
Autorzy:
Diego Iannuzzi, Mattia Ribera, Paola Satariano, Emanuele Fedele, Francesco Pagliarini, Pasquale Cennamo, Filippo Orsini, Luigi Petrazzuoli, Marcello Spinelli
Opublikowane w:
2023 IEEE International Conference on Electrical Systems for Aircraft, Railway, Ship Propulsion and Road Vehicles & International Transportation Electrification Conference (ESARS-ITEC), 2023
Wydawca:
IEEE
DOI:
10.1109/ESARS-ITEC57127.2023.10114873
Autorzy:
Simone Barcellona, Silvia Colnago, Emanuele Fedele, Diego Iannuzzi, Luigi Piegari, Mattia Ribera
Opublikowane w:
2023 IEEE Vehicle Power and Propulsion Conference (VPPC), 2024
Wydawca:
IEEE
DOI:
10.1109/VPPC60535.2023.10403323
Autorzy:
Georgios P. Trachanas, Apostolos Arsenopoulos, Theodoros Tsalidis, Filippos Serepas, Ourania Markaki, Dimitrios Askounis
Opublikowane w:
2024 15th International Conference on Information, Intelligence, Systems & Applications (IISA), 2024
Wydawca:
IEEE
DOI:
10.1109/IISA62523.2024.10786695
Autorzy:
Steffen Kortmann, Johannes Jeup, Florian Schmidtke, Andreas Ulbig
Opublikowane w:
2024 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE), 2025
Wydawca:
IEEE
DOI:
10.1109/ISGTEUROPE62998.2024.10863684
Autorzy:
Diego Iannuzzi, Babak Fahimi, Ciro Napolitano
Opublikowane w:
2023 IEEE International Conference on Electrical Systems for Aircraft, Railway, Ship Propulsion and Road Vehicles & International Transportation Electrification Conference (ESARS-ITEC), 2023
Wydawca:
IEEE
DOI:
10.1109/ESARS-ITEC57127.2023.10114902
Autorzy:
Gianluca Brando, Diego Iannuzzi, Mattia Ribera
Opublikowane w:
2024 International Symposium on Power Electronics, Electrical Drives, Automation and Motion (SPEEDAM), 2024
Wydawca:
IEEE
DOI:
10.1109/SPEEDAM61530.2024.10609193
Autorzy:
Angel Paredes, Jose A. Aguado, Philipp Fisch, Patrick Witte, Sebastian Theissen, and Pedro Rodrıguez
Opublikowane w:
IEEE 15th International Symposium on Power Electronics for Distributed Generation Systems (PEDG 2024)
Wydawca:
IEEE
Autorzy:
Ángel Paredes, José A. Aguado
Opublikowane w:
IEEE PowerTech 2025
Wydawca:
IEEE
DOI:
10.1109/POWERTECH59965.2025.11180365
Autorzy:
Aoxiang Ma, Salah Ghamizi, Jun Cao, Pedro Rodriguez Cortes
Opublikowane w:
2025 IEEE Kiel PowerTech, 2025
Wydawca:
IEEE
DOI:
10.1109/POWERTECH59965.2025.11180414
Autorzy:
Martín Santos, Carolina María Arredondo Rodríguez, Francisco Arnaltes Gómez, Santiago Alonso-Martínez de las Morenas, Jaime Manuel Rodríguez Amenedo, José Luis
Opublikowane w:
IEEE 15th International Symposium on Power Electronics for Distributed Generation Systems (PEDG 2024)
Wydawca:
IEEE
Autorzy:
Angel Paredes; Yihong Zhou; Chaimaa Essayeh; José A. Aguado; Thomas Morstyn
Opublikowane w:
2024 IEEE PES Innovative Smart Grid Technologies Europe (ISGT EUROPE), 2024
Wydawca:
IEEE
DOI:
10.48550/ARXIV.2410.17607
Autorzy:
D. Ferreira-Martinez, Filipe Tadeu Oliveira, F. J. Soares, C. L. Moreira, Rui Martins
Opublikowane w:
2024 IEEE 15th International Symposium on Power Electronics for Distributed Generation Systems (PEDG), 2024
Wydawca:
IEEE
DOI:
10.1109/PEDG61800.2024.10667430
Autorzy:
M. F. Almeida, F. J. Soares, F. T. Oliveira, J. T. Saraiva, Rui M. Pereira
Opublikowane w:
2024 IEEE 15th International Symposium on Power Electronics for Distributed Generation Systems (PEDG), 2024
Wydawca:
IEEE
DOI:
10.1109/PEDG61800.2024.10667365
Autorzy:
Martín Santos, Carolina M.; ARREDONDO, FRANCISCO; ARNALTES, SANTIAGO; Alonso-Martínez, Jaime; Rodríguez Amenedo, José Luis
Wydawca:
ICREPQ25
DOI:
10.5281/ZENODO.20831049
Autorzy:
Steffen Kortmann, Johannes Jeup, Constantin Ernst, Florian Schmidtke, Andreas Ulbig
Opublikowane w:
2024 IEEE Power & Energy Society General Meeting (PESGM), 2024
Wydawca:
IEEE
DOI:
10.1109/PESGM51994.2024.10689185
Autorzy:
Steffen Kortmann, Selen Albant, Florian Schmidtke, Andreas Ulbig
Opublikowane w:
2025 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT Europe), 2025
Wydawca:
IEEE
DOI:
10.1109/ISGTEUROPE64741.2025.11305487
Autorzy:
Simone Barcellona, Mattia Ribera, Emanuele Fedele, Luigi Piegari, Lorenzo Codecasa, Diego Iannuzzi
Opublikowane w:
2024 IEEE International Conference on Electrical Systems for Aircraft, Railway, Ship Propulsion and Road Vehicles & International Transportation Electrification Conference (ESARS-ITEC), 2025
Wydawca:
IEEE
DOI:
10.1109/ESARS-ITEC60450.2024.10819863
Autorzy:
Ángel Paredes, José A. Aguado, Pedro Rodríguez
Opublikowane w:
2024 IEEE 15th International Symposium on Power Electronics for Distributed Generation Systems
Wydawca:
IEEE
Autorzy:
P. Franzese, M. Ribera, D. Iannuzzi
Opublikowane w:
IET Conference Proceedings, Numer 2023, 2024, ISSN 2732-4494
Wydawca:
Institution of Engineering and Technology (IET)
DOI:
10.1049/ICP.2023.2702
Autorzy:
Ciro Attaianese, Antonio Di Pasquale, Emanuele Fedele, Diego Iannuzzi, Mario Pagano, Mattia Ribera
Opublikowane w:
2022 IEEE Vehicle Power and Propulsion Conference (VPPC), 2024
Wydawca:
IEEE
DOI:
10.1109/VPPC55846.2022.10003390
Autorzy:
Alexandros Kafetzis, Michael Bampaou, Tzouliana Kraia, Kyriakos D. Panopoulos
Opublikowane w:
Energies, Numer 19, 2026, ISSN 1996-1073
Wydawca:
MDPI AG
DOI:
10.3390/EN19102340
Autorzy:
Carolina M. Martín; Santiago Arnaltes; Francisco Arredondo; Jaime Alonso-Martínez; José Luis Rodríguez-Amenedo
Opublikowane w:
Renewable Energy Focus, Numer 56, 2026, ISSN 1878-0229
Wydawca:
Elsevier
DOI:
10.1016/J.REF.2025.100786
Autorzy:
Iason C. Dimitriou, Elissaios Sarmas, Georgios P. Trachanas, Vangelis Marinakis, Haris Doukas
Opublikowane w:
Renewable and Sustainable Energy Reviews, Numer 207, 2025, ISSN 1364-0321
Wydawca:
Elsevier BV
DOI:
10.1016/J.RSER.2024.114962
Autorzy:
Pasquale Franzese, Diego Iannuzzi, Santolo Meo
Opublikowane w:
IEEE Electrification Magazine, Numer 13, 2026, ISSN 2325-5897
Wydawca:
Institute of Electrical and Electronics Engineers (IEEE)
DOI:
10.1109/MELE.2025.3624757
Autorzy:
Ángel Paredes, Jean-François Toubeau, José A. Aguado, François Vallée
Opublikowane w:
Sustainable Energy, Grids and Networks, Numer 42, 2025, ISSN 2352-4677
Wydawca:
Elsevier BV
DOI:
10.1016/J.SEGAN.2025.101677
Autorzy:
Fabien Bernier, Jun Cao, Maxime Cordy, Salah Ghamizi
Opublikowane w:
IEEE Transactions on Power Systems, Numer 40, 2025, ISSN 0885-8950
Wydawca:
Institute of Electrical and Electronics Engineers (IEEE)
DOI:
10.1109/TPWRS.2025.3596774
Autorzy:
Pasquale Franzese, Dhruvi Dhairya Patel, Ahmed A. S. Mohamed, Diego Iannuzzi, Babak Fahimi, Massimo Risso, John M. Miller
Opublikowane w:
IEEE Transactions on Transportation Electrification, Numer 9, 2024, ISSN 2332-7782
Wydawca:
Institute of Electrical and Electronics Engineers (IEEE)
DOI:
10.1109/TTE.2023.3239224
Autorzy:
null Carolina M. Martín, null Francisco Arredondo, null Santiago Arnaltes, null Jaime Alonso-Martínez, null José Luis Rodríguez-Amenedo
Opublikowane w:
Renewable Energy and Power Quality Journal, Numer 23, 2026, ISSN 2172-038X
Wydawca:
UK Zhende Publishing Limited Company
DOI:
10.52152/4576
Autorzy:
Salah Ghamizi, Jun Cao, Aoxiang Ma, Pedro Rodriguez
Opublikowane w:
IEEE Transactions on Power Systems, Numer 40, 2025, ISSN 0885-8950
Wydawca:
Institute of Electrical and Electronics Engineers (IEEE)
DOI:
10.1109/TPWRS.2024.3465088
Autorzy:
Ángel Paredes, José A. Aguado
Opublikowane w:
Electric Power Systems Research, Numer 234, 2024, ISSN 0378-7796
Wydawca:
Elsevier Science SA
DOI:
10.1016/j.epsr.2024.110633
Autorzy:
Andres Tarraso, Jose Ignacio Candela, Joan Rocabert, Pedro Rodriguez
Opublikowane w:
IEEE Transactions on Power Delivery, Numer 39, 2024, ISSN 0885-8977
Wydawca:
Institute of Electrical and Electronics Engineers (IEEE)
DOI:
10.1109/TPWRD.2024.3457164
Wyszukiwanie danych OpenAIRE...
Podczas wyszukiwania danych OpenAIRE wystąpił błąd
Brak wyników