The concept of the automated phagogram was developed during the period 2019 – 2022 to a point where a working prototype was demonstrated. During the last year, the industrial production development of the prototype was planned and tested. This further development was performed using a rigid schedule guided by the European Regulation for developing, manufacturing and testing of In Vitro Diagnostic tests. Simultaneously with the dossier for the test equipment and material, a 2nd workplan was completed developing the software necessary to manage and run the test system. March 2024, the company was ready to start the validation tests on the Phagogram. This validation, amongst others, contains a clinical validation of the susceptibility test in different European hospitals which will demonstrate the performance and reliability of the test and its predictive value for composing the right bacteriophage cocktails to treat in a personalized model drug multiresistant infections. However, during the verification phase, which is preceding the validation phase and is the 1st check of the performance in a real-world situation, it appeared that main values for the sensitivity of the test were unacceptable and made the validation phase impossible. Main reason for this underperformance is the total absence of standards, norms and guidelines like they are existing in bacterial microbiology. Old fashioned unvalidated techniques had to be used as standard reference methods. A mitigation strategy was planned very precisely and comprised amongst other measures the validation of different reference techniques against each other and the phagogram and drastically increasing the sample size. In this way, Inteliphage developed its own standards. Methodology for developing the algorithm guiding the test results finally led to a performance where precision, robustness and sensitivity are more than 90% making the test now very performant. The Phagogram is now ready to take the last step and start the final validation procedure, planned Q2-Q3 - 2026 ,to be ready for final CE-marking as IVD