Information gathering for hypothesis validation has been carried out through interviews with potential clients, end users and partners. Most of the interviews have been conducted face to face and the rest have been conducted via telephone and videoconference. A semi-structured interview approach was followed using a questionnaire as the basis of the study but elaborating on the comments brought up by the participant. This approach has enriched the results and allowed identifying new perspectives for the analysis and new opportunities for the technology.
Four types of entities have been interviewed: TSOs, utilities, Engineering, Construction and Procurement companies (EPC) and research centres:
•TSOs and utilities (3 participants): TSOs and utilities are potential end users of energy storage technologies. Main advantages for them include improvements in the reliability and quality of the supply and flexibility in power generation scheduling, including a bigger share of renewable energy
•EPCs (6 participants): EPCs are responsible for the supply of energy storage solutions that best matched their client’s requirements. They usually work for utilities and TSOs and, as a consequence, they are aware of their needs. EPCs can also provide information about energy storage in industrial applications, microgrids and also as part of generation assets that need energy storage to comply with grid codes.
•R&D centres (1 participant): with the exception of lead acid batteries, grid tied advanced electrochemical energy storage is a relatively recent development and its long term performance still needs to be assessed. R&D centres can offer a wider perspective both in terms of commercial solutions and technologies under development. R&D centres work along with grid operators, utilities, EPC and manufactures of electrochemical storage technologies and can provide a cross-perspective that it couldn’t be obtained otherwise.
Primary focus of the research is assessing the needs for the European market. However, since EPCs consulted have worldwide operations, information provided from non-European energy storage projects has been gathered. TSOs have also provided relevant information from non-European markets by contrasting their approach with foreign counterparts.
Main Results
Thanks to the semi-structured nature of the interviews, information gathered exceeded the answers of the questionnaire. General qualitative perceptions from the stakeholders participating in the research and their impression on their experience and awareness about energy storage are summarised before:
Limited experience in real deployment of the technology: although all participants in the industry are aware of energy storage advantages, in depth knowledge about implementation and exploitation strategies is rare. This is the main causes why some participants were not able to give their opinion on some of the topics surveyed.
Turnkey systems are the standard: utilities, TSOs and EPCs agreed that the preferred option for acquiring energy storage systems are turnkey systems. With the exception of Lead Acid batteries, electrochemical energy storage integration is not well known. Battery design and dimensioning depends on the chemistry chosen and the expected use. Therefore, EPCs rely on turnkey systems provided by a third party (battery integrators). EPCs are now working closely with technology suppliers in the system requirements in order to prevent inadequate performance or early degradation of the system. Suppliers can differentiate not only by their technology but also by the technical assistance provided during the design phase.
Cautious approach from TSOs and utilities: In general terms, utilities and TSOs (with notable exceptions though) have not gone beyond pilots ranging from the kWh range to a few MWh range. The degree of grid integration and battery use in each pilot varied between projects due to the precautions adopted to prevent disturbances in the grid and the need to preserve battery life due to the lack of experience in its operation.
Reactive approach from EPCs: EPCs have adopted a reactive approach towards energy storage due to the lack of experience in their long term operation and the need to provide warranties on the systems deployed on behalf of the battery supplier. Warranties are a cause of concern due reported rapid degradation in cases of intensive use. One EPC reported having recently turned down an opportunity for the deployment of an energy storage system due to the uncertainties in terms of full life cycle cost and the reliability of the system.
Legal framework is not adapted to energy storage capabilities: TSOs confirmed that energy storage could be very helpful in order to solve some of the problems they are facing to optimally stabilise the grid, but storing energy and releasing it shortly afterwards is considered a distortion in the energy markets which is not possible for TSOs. Third parties providing this kind of services could be interesting for TSOs but it was considered unlikely due to the lack of suitable market conditions that create profitable business models. In some countries, energy storage (among other demand side management alternatives) is restricted for grid stabilisation. Utilities had a mixed perspective, while some considered that a central European market for ancillary services was attractive enough, others said that with the current costs of energy storage and market conditions, other alternatives were more favourable. Cost reductions in energy storage will create attractive business cases in the mid-term. EPCs see few opportunities in Europe and consider that the United States offers better opportunities thanks to a favourable legal framework for fast acting accurate systems such as batteries.
Energy storage applications not originally considered in this study: EPCs provided additional examples of applications for energy storage. Most of the cases were specific for microgrids such as the case of mines or antennas in isolated areas. Other applications were power firming and black-start services in coal fired power stations, power quality improvement in harbours and diesel back-up substitution for PV feed irrigation systems. Two of the EPCs considered that the technology could be applied as part of railway infrastructure for energy harvesting from the braking trains, investment deferral in substations or distributed generation