Risultati finali
3 tracker modules (+ 4 spares) ready for integration and system tests
TOF componentsDesign of the TOF detector and procurement of components (scintillator, SiPM, ASICs),
Tracker Frontend BoardsDelivery of TFBs for tracker modules (14 StripX and 7 StripY)
Magnet sectorsDelivery of 2 magnet sectors (+3 spares)
TOF front-endProduction of 5 TOF front-end boards
Support structureDelivery of the mechanical support structure for the demonstrator
Pixel readout PCBDesign and production of the readout PCB
DHU modulesProduction of 1 DHU modules (+ 2 spare) for system AIV
DHU prototypesProduction of 3 DHU prototype boards
Pixel chipsetsA Timepix3 chip will be bonded to a standard 300 µm thick silicon pixel detector of the same cell size (55µm×55µm) to produce a sensor-Timepix3 chipset.
Strip sensorsDelivery of sensors for tracker modules (14 StripX and 7 StripY)
TOF modules2 TOF modules (+ 3 spares) ready for integration and system test
Pixel modules2 Pixel modules (+ 3 spares) ready for integration and system test
DemonstratorDelivery of the demonstrator
Plan for the dissemination and exploitation of result
Tracker test reportTracker module test report
technical/scientific review meeting documents 1technical/scientific review meeting documents fro the first reporting period
DHU test reportDHU module test report
Space Qualification tests reportDemonstrator Space Qualification tests report
Pixel test reportPixel module test report
AIV reportDemonstrator AIV report
Interim technical reportThe interim technical report is meant to provide an intermediate overview on all the deliverables (DEM) due at M18 and M24 (D2.1, D3.1, D3.2, D3.3, D4.2, D4.3,D5.2, D5.3, D6.1, D6.2, D7.1) with respect to the design, technicalities of the demonstrators (mainly). It is meant to assure that there is enough substance for the review that will take place right after the end of the first reporting period (M12), and this includes scientific information on top of the management information present in the periodic reports (RP1).
Magnet test reportInterim technical report update
update on the status of the deliverables (DEM) due at M18 and M24 (D2.1, D3.1, D3.2, D3.3, D4.2, D4.3, D5.2, D5.3, D6.1, D6.2, D7.1)
TOF test reportTOF module test report
Interim dissemination and exploitation planInterim plan for the dissemination and exploitation of result as required
technical/scientific review meeting documents 2technical/scientific review meeting documents for the second reporting period
project web site for communication, dissemination, exploitation and outreach
Data management plan as required
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE