1 MW photovoltaic (PV) power plant in the centre of Spain

Cel



The 1 MW plant in Toledo is a project resulting from the participation of new EUROPEAN COMMUNITY Directorates (DG XII and DG XVII) and the cooperation of two large electrical companies, the Spanish UEF and the German RWE.

The project grew out of the study of a combined operation of a small hydroelectric power and a PV power plant for a region with a surplus water supply in the winter months and a scarcity of water and high solar energy during the summer months.

The main objective of the plant is to minimize the cost of energy produced (ECU/Kwh).

The plant will consist of a 1 MW PV generator directly coupled to one (or several) DC/AC inverters and connected to a 15 KV. electrical grid via a transformer.

The main criteria used in this project is to improve the significant European know-how in the field of photovoltaic energy: develop large modules, technical and cost data for inverters and their control scheme, photovoltaic arrays structure and several power segment and System Engineering Studies.

Temat(-y)

Data not available

Zaproszenie do składania wniosków

Data not available

System finansowania

Data not available

Koordynator

UNION ELECTRICA FENOSA S.A.
Wkład UE
Brak danych
Adres
CAPITAN HAYA, 53
28020 MADRID
Hiszpania

Zobacz na mapie

Koszt całkowity
Brak danych

Uczestnicy (1)