IMPROVED MINE PILLAR DESIGN AND GROUND CONTROL BY USING ROCK MECHANICS FOR BAUXITE MINING

Cel

The development of a laboratory and field scale and the application of modern rock mechanics techniques and principles on rock behaviour, in mine pillar design and roof control in order to establish safer underground mining conditions under increased extraction rate and reduced mine costs in bauxite mining.
The methodology adopted led to the development of a scientific approach to pillar design in discontinuous rock masses. It can be equally well applied to any underground mine where stability is maintained using natural rock supporting elements and structural problems due to the behaviour of the rock mass are encountered. Such a methodology is more reliable than a purely empirical approach to the design of naturally supported mine layouts in discontinuous rock masses. Validation and calibration of the methodology, through comparison to in situ measurements, offers advantages in terms of safety and ore recovery when compared to other approaches.
The work to be carried out comprises 8 stages. These are as follows.

Stage 1 is the identification of the problem. Collection and evaluation of all existing data. Selection of mines and sites in the mines for the project.

Stage 2 is the geomechanical study. It will include collection of all basic engineering data necessary for a detailed geomechanical study of the sites selected. The mechanical properties and quality indices of the intact rock (bauxite and limestone) determined. A detailed discontinuity study of the rock mass will be carried out using the classical field techniques coupled with photoanalysis. The geomechanical data gathered will allow the establishment of the rock mass characterization.

Stage 3 is the detailed geomechanical study of selected pillars and roof sites. Field and photographic techniques will be used to study the characteristics of the discontinuity patterns present and to identify other rock mass parameters. The rock mass modulus of deformation will be calculated based on the CSIR and Q classification systems. Evaluation of early field results derived from exploration boreholes will be used as guides to an early mining planning. Graphical representation of the discontinuity data of the rock masses and joint cluster analysis by means of probabilistic techniques will be performed.

Stage 4 is the laboratory tests which will be conducted on both the intact rock and on selected rock pieces that include discontinuities. Scale effects will be studied up to the size of the maximum pillar used. The criteria of failure will be established.

Stage 5 is the field tests. The appropriate rock mechanics instruments and equipment will be installed in selected underground locations in order to establish the deformability features of the rock mass. Pillar stress variations will be established as mining proceeds away from the pillar by making use of the previous instrument or additional. Field tests will be carried out using seismic geophysical methods or ground penetrating radar. Equipment improvements, modifications and adjustments will be made in order that the results obtained can be of direct use to this study. A 3-dimensional presentation of the discontinuity patterns present in the bauxite pillars will be attempted using tomographic and geostatistic techniques. Special attention will be given to acoustic emission and microseismic activity of the pillars as a warning before failure. A correlation will be attempted of acoustic pulse propagation characteristics in the rock mass to certain geomechanical rock features and factors.

Stage 6 is the evaluation of results. Application of numerical modelling techniques to describe rock behaviour. Comparison of numerical modelling results to experimental field results derived from underground measurements. Appropriate improvements of the model in order that theory and field results correlate with each other. Suggestions for improvement of the exploitation method being applied.

Stage 7 is the application of the derived model to the design of future underground mines. Necessary modifications affected by the general layout of the mine. Planning will be attempted to include simultaneously a sound theoretical background and reliable field methods in such a way as to supplement each other so that finally a realistic and scientifically fully supported underground design in case of room and pillar mining will result.

Stage 8 is the final joint report.

Dziedzina nauki (EuroSciVoc)

Klasyfikacja projektów w serwisie CORDIS opiera się na wielojęzycznej taksonomii EuroSciVoc, obejmującej wszystkie dziedziny nauki, w oparciu o półautomatyczny proces bazujący na technikach przetwarzania języka naturalnego. Więcej informacji: Europejski Słownik Naukowy.

Aby użyć tej funkcji, musisz się zalogować lub zarejestrować

Program(-y)

Wieloletnie programy finansowania, które określają priorytety Unii Europejskiej w obszarach badań naukowych i innowacji.

Temat(-y)

Zaproszenia do składania wniosków dzielą się na tematy. Każdy temat określa wybrany obszar lub wybrane zagadnienie, których powinny dotyczyć wnioski składane przez wnioskodawców. Opis tematu obejmuje jego szczegółowy zakres i oczekiwane oddziaływanie finansowanego projektu.

Brak dostępnych danych

Zaproszenie do składania wniosków

Procedura zapraszania wnioskodawców do składania wniosków projektowych w celu uzyskania finansowania ze środków Unii Europejskiej.

Brak dostępnych danych

System finansowania

Program finansowania (lub „rodzaj działania”) realizowany w ramach programu o wspólnych cechach. Określa zakres finansowania, stawkę zwrotu kosztów, szczegółowe kryteria oceny kwalifikowalności kosztów w celu ich finansowania oraz stosowanie uproszczonych form rozliczania kosztów, takich jak rozliczanie ryczałtowe.

CSC - Cost-sharing contracts

Koordynator

National Technical University of Athens
Wkład UE
Brak danych
Adres
42,Odos 28 Octovriou
10682 Athens
Grecja

Zobacz na mapie

Koszt całkowity

Ogół kosztów poniesionych przez organizację w związku z uczestnictwem w projekcie. Obejmuje koszty bezpośrednie i pośrednie. Kwota stanowi część całkowitego budżetu projektu.

Brak danych

Uczestnicy (3)

Moja broszura 0 0