Final report on dissemination and communication activities
(odnośnik otworzy się w nowym oknie)
A report describing the implementation of dissemination and communication activities throughout the project, and compilation of all the project outputs will be prepared.
Report on the standardization landscape and applicable standards
(odnośnik otworzy się w nowym oknie)
A report describing available standards relevant for SURE2COAT will be elaborated.
Report on the contribution to standardization M9
(odnośnik otworzy się w nowym oknie)
A report based on SURE2COAT outputs as possible contributions for the elaboration of new standards will be prepared.
First draft of DCP
(odnośnik otworzy się w nowym oknie)
A draft of DCP will be elaborated and will be used as guideline for the implementation of dissemination and communication activities.
Common durability assessment procedure
(odnośnik otworzy się w nowym oknie)
Common durability assessment procedures for performance evaluation of shapes and surface treatments engineered in the project is to be developed in collaboration with research and industry partners. Common procedures will allow for component/coating durability evaluation under comparable and relevant conditions such as corrosive environments, exposure times, temperature regimes/thermal cycling.
LCC and E-LCA of ST technologies for all use cases M36
(odnośnik otworzy się w nowym oknie)
Updated version of deliverable 5.3
Cost-benefit analysis
(odnośnik otworzy się w nowym oknie)
A cost analysis will be completed to quantify the potential saving for each use case through the measured improvement on the different properties affecting their performance in terms of lifetime, heat transfer rate, and thermal conductivity thus minimising capital cost and maximising energy efficiency.
Preliminary report on dissemination and communication activities
(odnośnik otworzy się w nowym oknie)
A report describing the implementation of dissemination and communication activities and compilation of resulting outputs during the first 12 months of the project will be prepared.
Final report on linking and exploitation activities
(odnośnik otworzy się w nowym oknie)
A report detailing links to other national and international projects, and other EU initiatives related to SURE2COAT will be prepared.
Report on the contribution to standardization M36
(odnośnik otworzy się w nowym oknie)
A report based on SURE2COAT outputs as possible contributions for the elaboration of new standards will be prepared. Updated version of 6.11.
Report on the contribution to standardization M18
(odnośnik otworzy się w nowym oknie)
A report based on SURE2COAT outputs as possible contributions for the elaboration of new standards will be prepared. Updated version of 6.10.