Skip to main content
Przejdź do strony domowej Komisji Europejskiej (odnośnik otworzy się w nowym oknie)
polski polski
CORDIS - Wyniki badań wspieranych przez UE
CORDIS

Danube Region Water Lighthouse Action

Periodic Reporting for period 1 - DALIA (Danube Region Water Lighthouse Action)

Okres sprawozdawczy: 2023-01-01 do 2024-06-30

DALIA (Danube Region Water Lighthouse Innovation Action) is comprised of 22 expert organizations – including universities, authorities, SMEs and NGOs – from 8 different Danube EU and Associated countries accumulating an outstanding set of knowledge, covering not only the basin geographically but all different fields of expertise necessary to deal with the multidisciplinary issues from source to sea. DALIA innovation actions are supported by the 9 Demonstration Pilot Sites (DPS) in the 6 countries in the Danube River basin area, that cover the specific outcomes in the project action and will serve as an input to forthcoming Horizon Europe projects and missions. A scaling of the relevant solutions is also envisaged throughout a set of 3rd party calls within associated countries with fitting water challenges.The project brings to DRB integrated DALIA tool, which will be integrate into Danube Mission Hub for better decision making to improve DRB restoration of fresh and transitional water ecosystems; it provides options for strategies and policies that concern freshwater ecosystem protection and ecosystem connectivity in DRB and improved protection of local communities and ecosystems from extreme events and pollution threats. Thanks to the DALIA tool combined with the Danube Mission Knowledge Hub we will provide end users with crucial information for water management optimization and key data for defensible, transparent decision-making and prioritization of prevention programs to be implemented on local – regional and DRB scale. Promoting and empowering science-based decisions will strengthen their basis and widen acceptance of cost-effective management and technology solutions in the DRB region, enabling improved incorporation of advanced, actual knowledge and innovative technologies (via pilot collaboration and clustering). The organizations within DALIA will utilize expert experience from already completed and currently running successful project actions (via a Consultation Expert Panel). https://www.dalia-danube.eu(odnośnik otworzy się w nowym oknie)
The project methodology is structured in different thematic areas including current situation and main problems of the Danube River basin (DRB), Demonstration Pilot Site analyses, analysis and transfer of knowledge in WP1. It aimed research the nine demonstration sites, each representing distinct locations and environmental challenges within the basin. These sites are strategically clustered into five key categories: Flood Plains, Spring Areas in Basin Subcatchments, Fish Passes, Sediment Transport Zones. To comprehensively study these diverse environments, we employ a hydrological model that represents various processes occurring at the pilot sites. WFD RBMPs maps for Danube catchment including subunits, Danube River catchment, DPS information on DALIA KMS have been published.Best practice replication in WP2 improved the DALIA tool: Database of associated regions and tools for analysis will be used for assessment of associated regions and their relevance for concrete transfer. Develop a methodology for socio-economic, environmental, and water conditions assessment of regions in the Danube river basin and provide analysis of regions. Furthermore WP2 performed the launch/publication of the project open call, which addresses the project different DPS replication solutions offered in order to engage most promising third parties’ propositions to pursue DALIA goals. Open Call have been officially published at 18th of July 2024. Socio-economic transition in WP3 Multi-actor process and validation framework have been done. The document provides an introduction to the nine DALIA demonstrator sites, describes the multi-actor process, and establishes a multi-aspect validation framework (scientific validation, climate modelling and systems validation, stakeholder engagement, business models and scenarios). Finally, the deliverable provides an initial impact analysis for the framework. Furthermore the Regional Expert Boards document defines the scope and mission of the expert boards, the method to set-up the boards, and the criteria for involving experts, also defines the operational model for the expert boards. Finally as preliminary actions for the development of sustainable validation and business model (to be submitted in M48), including the compilation of groups of regional stakeholders to be invited to participate in the validation process, drafting of preliminary profiles of demonstrators for future development of pitch decks, analysis of targeted economic sectors.In WP4, we have identified a series of projects with which we will be able to collaborate and, through the exchange of information and solutions, contribute to the achievement of Horizon's objectives. Restore4Life - Restoration of wetland complexes as life supporting systems in the Danube Basin: EcoDaLLi, DaWetRest, Danube4All, EcoAdvance, Sundanse , EUROLakes , FERRO. The other links with the various other projects are starting to be implemented: Climate Picnic program, COST Action CA22122 RethinkBlue, BlueMissionAA, Danube Water Balance. WP5 of DALIA runs across the entire duration of the project. Ensure the DALIA results reach the relevant stakeholders and enable potential future exploitation of the DALIA results. Provide the proposed dissemination and communication activities and ensure the DALIA's findings are widely communicated to the scientific community and the general public. Attract business partners and potential stakeholders and to create market demand. Deliver policy recommendations to relevant Mission- related bodies, initiatives EU bodies Ensure clustering and coordination with other related EU/National DALIA’s and initiatives. WP6 We have successfully completed the launch of the project by effectively performing the all the obligatory project event like kick off, partner meeting with study trips management and coordination as well.
Developed the "Pilot site (DPS): Slovakia Upper Catchment of Vah River, Kysuce Region" methodology, in which solutions propose to retain rainwater in the damaged structures of the country as an ecosystem and how this will contribute to their regeneration and improvement of hydrology of small watercourses, to the supply of water resources, to the improvement of the yield of water resources in the period of poor rainfall.
The entire basin of the Kysuca River was analyzed using CN curve calculation methods. The goal is to quantifying the volume of rainwater that actually drains during rainfall and to translate this knowledge into landscape planning and tools for the water plan of the Kysuca River.
Moja broszura 0 0