Plan for dissemination and exploitation including communication activities
(odnośnik otworzy się w nowym oknie)
Plan for the dissemination and exploitation of the results, including the the Communication and Dissemination Strategy (CDS).
Report on security controls for future BMS
(odnośnik otworzy się w nowym oknie)
Report on the security controls protecting critical operations and configuration data of and in the BMS, mitigating all high and critical risks identified in WP2.
BMS multi-sensing report
(odnośnik otworzy się w nowym oknie)
Report on the fibre optic spider system to be implemented in the battery and the advanced multi sensing unit with capabilities to send H2, gases, pressure and to drive active protections of the battery-pack such as pyro fuses, including the multi-sensing temperature from laboratory to the industrial level.
Plan for iBattMan training activities
(odnośnik otworzy się w nowym oknie)
Planning of training activities throughout the project.
BMS test-cases definition
(odnośnik otworzy się w nowym oknie)
Report on the first validation assessment of the BMS design by means of a set of consecutive tests based on the V-Shaped ASPICE development standard to provide a validated BMS to the Batt-pack integrators.
BMS design definition and architecture proposal
(odnośnik otworzy się w nowym oknie)
Report on the block architecture of the BMS and the internal HW/SW and Mechanical interfaces. Description of the Functional Safety concept of the architecture and insight of the required computational power at the BMS