Cel The combustion of coal in front of the tuyeres presents a possible limit to increasing coal injection into the blast furnace. It is intended to build a laboratory furnace in which a fixed coke bed is heated to raceway temperatures. The objective is to determine the amount of char and soot, which leaves the cokebed. Various types of coal will be injected at injection rates of 100-400kg coal/tonne of hot metal. This project is complementary with projects from CSM (P2412) and from British Steel (P2445). Program(-y) ECSC-STEELRES 7C - Medium-term guidelines (ECSC) "technical steel research", 1986-1990 Temat(-y) B - Reduction of iron ores Zaproszenie do składania wniosków Data not available System finansowania CSC - Cost-sharing contracts Koordynator KONINKLIJKE HOOGOVENS Wkład UE Brak danych Adres 1970 CA IJMUIDEN Niderlandy Zobacz na mapie Koszt całkowity Brak danych