European Commission logo
polski polski
CORDIS - Wyniki badań wspieranych przez UE
CORDIS

CoSt redUction and enhanced PERformance of PV systems

Rezultaty

Education events for the interested public in each region identified as suitable

Report with description and full set of education materials used in education events for the interested public in each region selected for dissemination. Indicator: full set of education materials used in education events for the interested public is present T8.3

Proceedings of the organised Events

Deliverable will integrate into single document published proceedings of project organized events. Indicator: targeted groups of reached stakeholders indicated in Section 2.5.4 are in line with planned. T9.5

Website

Deliverable will describe Project Web site design, site structure, main sections and information published as well as site visitors monitoring statistics analysis. It will also host an intranet for the internal use for the partners. Indicator: Web site operational. T9.2

Summer school for interested scientists on the project topics

Reports integrating into single document performed summer school description, presentations and list of participants. Indicator: summer schools performed, document with summer school description, presentations and list of participants is presented. T8.2

List of journalistic and scientific articles

Deliverable will present cumulative list of project related media and scientific articles with short summaries. Indicator: list of project related media and scientific articles is present. T9.3

The training and education material for all three target groups

Report covering prepared training and education materials for target groups identified under the project: 1. Expert and students within consortium, 2. Experts and students outside the consortium and 3. General public in each partner's region. Indicator: training and education material for all three target groups presented T8.1

Training and education event for experts from outside the consortium

Report on training events with training materials for experts outside the consortium. Indicator: full set of education materials used in education events for experts from outside the consortium is present T8.2

Report on Social Media Campaign

Deliverable will contain guidelines for a coherent and collaborative use of social media by all partners in relation to the project. Document also will present overview and analysis of social Media Campaign outcomes through different channels such as LinkedIn, Twitter and YouTube. Indicator: targeted groups of reached stakeholders indicated in Section 2.5.4 are in line with planned. T9.4

Compilation of promotional materials

Deliverable updated on yearly basis will lay out the main promotional activities, feedback from external stakeholder and its evaluation. This task includes the preparation and dissemination of two leaflets, biannual electronic newsletters, press releases, journalistic articles, scientific papers, and one online video. Indicator: compilation of promotional materials is presented. T9.3

Build demosites in Vilnius (Lithuania) and Norway

Deliverable will (Indicator) present description and technical plan for demosite in Vilnius and Norway. Indicator: Demo site implemented according D2.6 T6.3

Build demosites in Tozeur (Tunisia) and Morocco

Deliverable will present description and technical plan for demosite in Tozeur and Morocco. Indicator: Demo site implemented according D2.6 T6.1

Build demosites in Sevilla (Spain)

Deliverable will (Indicator) present description and technical plan for demosite in Sevilla. Indicator: Demo site implemented according D2.6 T6.2

Report on prototypes for demo testing

Report on structural and functional testing in line with certification standards of all developed prototypes power and communication electronics Indicator implemented PE prototypes are meeting certification standards for PE T46

Final coordination and management report (includes a report to be made available to the generic public)

Deliverable will contain Indicator detailed description of technical and management progress of the project during the whole project Will includes a summary report to be made available to the generic public T11T13

Fact sheet for the general public is ready for distribution

Deliverable will cover (Indicator) package of the fact sheets for the general public prepared for distribution. T8.1

36 month coordination and management report (including updated risk analysis and a summary available to the generic public) (2nd review process)

Deliverable will contain (Indicator) detailed description of technical and management progress of the project during the 36 months of project implementation. Will include updated risk analysis and a summary available to the generic public. T1.1-T1.3

18 month coordination and management report (including updated risk analysis and a summary available to the generic public) (1st review process)

Deliverable will contain (Indicator) detailed description of technical and management progress of the project during the first 18 months. Will include updated risk analysis and a summary available to the generic public. T1.1-T1.3

Report on fault-tolerant converter arhitectures and plant topologies

Report will present description of developed novel fault-tolerant converter designs for validation as well as the evaluation of novel PV plant topologies. Indicator: KPIs identified in D2.2 for fault-tolerant converter are met. T4.2b

Publikacje

Partial shading of one solar cell in a photovoltaic module with 3-terminal cell interconnection

Autorzy: Robert Witteck, Susanne Blankemeyer, Michael Siebert, Marc Köntges, Henning Schulte-Huxel
Opublikowane w: Solar Energy Materials and Solar Cells, Numer 219, 2021, Strona(/y) 110811, ISSN 0927-0248
Wydawca: Elsevier BV
DOI: 10.1016/j.solmat.2020.110811

Thickness evaluation of AlOx barrier layers for encapsulation of flexible PV modules in industrial environments by normal reflectance and machine learning

Autorzy: Enric Grau-Luque, Maxim Guc, Ignacio Becerril-Romero, Víctor Izquierdo-Roca, Alejandro Pérez-Rodríguez, Pieter Bolt, Fieke Van den Bruele, Ulfert Ruhle
Opublikowane w: Progress in Photovoltaics, Numer Volume30, Numer3, 2021, Strona(/y) 229-239, ISSN 1062-7995
Wydawca: John Wiley & Sons Inc.
DOI: 10.1002/pip.3478

Digitalization as a driver for supporting PV deployment and cost reduction

Autorzy: Erika Saretta1*, Pierluigi Bonomo1, Willy Maeder2, Van Khai Nguyen2 and Francesco Frontini1 1 SUPSI-DACD-ISAAC, 6850 Mendrisio, Switzerland 2 CADCAMATION, 1213 Onex, Switzerland
Opublikowane w: EPJ Photovoltaics, Numer 21050716, 2022, ISSN 2105-0716
Wydawca: EDP Sciences
DOI: 10.1051/epjpv/2021013

Three Bypass Diodes Architecture at the Limit

Autorzy: Robert Witteck, Michael Siebert, Susanne Blankemeyer, Henning Schulte-Huxel, Marc Kontges
Opublikowane w: IEEE Journal of Photovoltaics, Numer 10/6, 2020, Strona(/y) 1828-1838, ISSN 2156-3381
Wydawca: IEEE Electron Devices Society
DOI: 10.1109/jphotov.2020.3021348

A compact high-efficiency GaN based 400W solar micro inverter in ZVS operation

Autorzy: Van Sang Nguyen, Stéphane Catellani, Anthony Bier, Jérémy Martin, Henri Zara, Jérémie Aimé
Opublikowane w: EPE Europe 2020, 2020
Wydawca: EPE Europe 2020

Combustion Based Delamination of Si Glass/Glass Photovoltaic Modules

Autorzy: X. Ma, H. Bu, M. Rudzikas, J. Denafas, J. Ulbikas, A.G. Ulyashin
Opublikowane w: 37th European Photovoltaic Solar Energy Conference and Exhibition, Numer 2020, 2020, ISBN 3-936338-73-6
Wydawca: WIP
DOI: 10.5281/zenodo.4727547

Control of a two-stage, single-phase grid-tied, GaN based solar microinverter

Autorzy: Anthony Bier, Van Sang Nguyen, Stéphane Catellani, Jérémy Martin
Opublikowane w: 2020
Wydawca: PCIM 2020

Super PV Project Innovations - LCOE Assessment and Competitiveness

Autorzy: Haarberg, T.; Macé, P.; Bosch, E.; Ulbikas, J.; Denafas, J.; Ulyashin, A.G.
Opublikowane w: 38th European Photovoltaic Solar Energy Conference and Exhibition, 2021, ISBN 3-936338-73-6
Wydawca: WIP
DOI: 10.4229/eupvsec20212021-7do.12.3

SUPER PV project Developing innovative PV systems for cost reduction and enhanced performance

Autorzy: Juras Ulbikas, Vaidvilė Ulbikaite, Julius Denafas, Robert Witteck, Marc Köntges, Marko Topič, Francesco Frontini, Pierluigi Bonomo, Philippe Macé, Pieter Jan Bolt, Alexander Ulyashin, Torstein Haarberg, Wolfram Palitzsch, Barbara Terheiden, Ingrid Weiss, Antonio Fuentes
Opublikowane w: IEEE Photovoltaic Specialist Conference proceedings, Numer 15.07.2019, 2019
Wydawca: IEEE PVSC

Introducing the Super PV Project - Cost Reduction and Enhanced Performance of PV Systems

Autorzy: J. Ulbikas, V. Ulbikaite, J. Denafas, R. Witteck, M. Köntges, M. Topic, F. Frontini, P. Bonomo, P. Macé, P.J. Bolt, A.G. Ulyashin, T. Haarberg, W. Palitzsch, B. Terheiden, I. Weiss
Opublikowane w: 35th European Photovoltaic Solar Energy Conference and Exhibition, Numer 10.2018, 2018
Wydawca: WIP Renewable Energies
DOI: 10.4229/35theupvsec20182018-7dv.2.8

Super PV Project – Innovative and High-Quality PV Systems to Regain Leadership of European PV Businesses on the World Market

Autorzy: J. Ulbikas, V. Ulbikaite, J. Denafas, R. Witteck, M. Köntges, M. Topic, F. Frontini, P. Bonomo, E. Saretta, P. Macé, P.J. Bolt, A.G. Ulyashin, T. Haarberg, W. Palitzsch, B. Terheiden, I. Weiss, A. Fuentes Cano, J.L. Domínguez-García
Opublikowane w: 36th European Photovoltaic Solar Energy Conference and Exhibition, Numer 23.10.2019, 2019
Wydawca: WIP Renewable Energies
DOI: 10.4229/eupvsec20192019-7dv.2.1

SUPER PV Progress Report - Developing & Testing Innovative High Quality PV Systems to regain European leadership in the PV market

Autorzy: J. Ulbikas, J. Denafas, V. Ulbikaite, R. Witteck, M. Kontges, M. Topic, F. Frontini, P. Bonomo,, E. Saretta, P. Mace, P.J. Bolt, A.G. Ulyashin, T. Haarberg, W. Palitzsch, B. Terheiden, I. Weiss, N. LaPointe, J.L. Dominiguez-Garcia
Opublikowane w: 37th European Photovoltaic Solar Energy Conference and Exhibition, Numer 2020, 2020, ISBN 3-936338-73-6
Wydawca: WIP
DOI: 10.5281/zenodo.4725980

Kan usubsidierte solparker bli en realitet i Norge? (language: Norwegian)

Autorzy: Torstein Haarberg (BNW), Birgit Ryningen (SINTEF)
Opublikowane w: Teknisk Ukeblad, Numer 219, 2021, 2020, ISSN 1501-6633
Wydawca: Teknisk Ukeblad Media

SUPER PV PROJECT – SUPPORT COST-REDUCTION OF THE PV SYSTEM THROUGH INNOVATIVE

Autorzy: Julius Denafas
Opublikowane w: 2020
Wydawca: Zenodo
DOI: 10.5281/zenodo.4726041

Wyszukiwanie danych OpenAIRE...

Podczas wyszukiwania danych OpenAIRE wystąpił błąd

Brak wyników