Evolution of the Business and Strategic idea
The tradeoff analysis between the use of COTS and in-house manufactured elements has been key development element driving the PDR.
Being the cost-effective design a branching point of the whole INSAT project, a thoughtful analysis has been carried out in cooperation with the IADP Leader (D2.2 and D3.1).
Design and development
The architecture of both the Phase-1 and Phase-2 of INSAT system have been set-up, thanks also to the frequent meetings held with the IADP Leader. The logic of ATP and the system requirements have been tuned, along with the foreseen schedule and process time reduction.
The architecture of a signal routing module (Relay drawer) and a secondary module for the electrical power management have been designed.
Communication
The overall estimated reach of the dissemination actions ranges from 20.500 to 41.000 people.
A communication and dissemination final report has been prepared on M36, addressing the achievements:
- Publication of an editorial in the issue n° 3, Oct 2021 of the technical magazine “Tecnologia & Innovazione”.
- Publication of an editorial in the issue n° 2, May 2022 of the technical magazine “Tecnologia & Innovazione”.
- Publication of an editorial in the issue n° 3, October 2022 of the technical magazine “Tecnologia & Innovazione”.
- Publication of an editorial in the issue n° 4, December 2022 of the technical magazine “Tecnologia & Innovazione”.
- AIRTEC 2022 Exhibition, B2B, and Conference; Munich (GE) 26 - 28 October 2022. INSAT has shown a working prototype of the developed Test Bench.
- GITEX2022 trade fair in Dubai (UAE), 10 – 13 October 2022, selected by the European OTF-2 (Overseas Trade Fair) initiative. INSAT has shown a working prototype of the developed Test Bench.
- Invited speech "INSAT: How a new paradigm for the automated test equipment can boost the avionic applications market” at the Dubai World Trade Centre, Tech Rashid Hall, 12 Oct. 2022.
- Speech: “INSAT an integrated testing system for avionics equipment”, at the “1st Workshop on Mathematical Challenges to and from new technologies”, Roma 23-24 June 2022, Engineering Dept. of University of Rome "Sapienza“.
Management
The implementation agreement has been signed.
The Project Management Plan includes the INSAT project management structure, decisional chain, communication level inside and outside the beneficiaries and conflicts resolutions, assigned roles and responsibilities, and the reporting activities. The report also includes the quality standards, communication procedures, the agreed qualification procedures.
The meetings with the IADP Leader have been handled and managed.
Update of the contingency plan for possible new risks and corrective actions.
Deliverables and milestones: control of their quality and timely delivery.