KPIs analysis and socioeconomic impact
(odnośnik otworzy się w nowym oknie)
Analysis of KPIs to identify feasibility of electrifying the fleet, considering environment, economic, social, and industrial aspects.
Energy management system development and optimisation
(odnośnik otworzy się w nowym oknie)
Description of the digital-twin simulation framework including the energy and power management systems. The digital twin will be modular and flexible simulation framework, containing all subcomponents of the ships electrical system simulation models integrated into a high-level model which will be used as a design and optimization tool.
Report on Stakeholders’ engagement M18
(odnośnik otworzy się w nowym oknie)
Development of stakeholders' insight report and work package think-tank group
Use vessel case and electrical specification and requirements
(odnośnik otworzy się w nowym oknie)
Analysis different types of ships, identification of both technical and electrical requirements at the ship level and at port level. The electrification solution will be analyzed, differentiating in the short medium and long term between different topologies of ships that can be full electric or hybrid electric.