Cel
Main objective of “Integrated gas powertrain (InGas)” Collaborative Project is to deploy a custom designed engine integrated with specific aftertreatment systems applied to a light duty vehicle able to achieve a 10% higher fuel conversion efficiency than that of a corresponding 2006 diesel vehicle and complying with an emission level lower than Euro 6. Additional features are advanced storage systems and vehicle architectures, as well as multi-grade fuel tolerance and fuel flexibility. To achieve the InGas targets, three main combustion technologies will be compared: Sub-Project A1 “CNG technologies for passenger cars” will develop a natural gas car powered by a 1.4 liter displacement engine using the sequential multi-point port gas injection and following the stoichiometric approach; Sub-Project A2 “Turbo DI CNG engine” will develop a natural gas car powered by a 1.8 liter displacement engine using the direct gas in-cylinder injection and following a lean burn approach; Sub-Project A3 “Boosted lean burn gas engine” will develop a natural gas light-duty vehicle powered by a 1.9 liter displacement engine using port gas injection or low pressure direct gas injection and following the ultra-lean combustion approach. Three main enabling technologies will be compared and assessed Sub-Project B0 “Fuels for advanced CNG engines” will define / supply the gas mixture of the requested quality, conduct analysis and propose solutions in order to affect in a flexible way storage, combustion, aftertreatment and performance of the CNG vehicles; Sub-Project B1 “Gas storage for passenger car CNG engine” will develop advanced gas storage and filling systems including specific components and gas sensors; Sub-Project B2 “Aftertreatment for passenger car CNG engine” will develop an aftertreatment system for natural gas vehicles having special regards to CH4 conversion efficiency and NOx abatement under stoichiometric and lean combustion operations.
Dziedzina nauki
Słowa kluczowe
Zaproszenie do składania wniosków
FP7-SST-2007-RTD-1
Zobacz inne projekty w ramach tego zaproszenia
System finansowania
CP-IP - Large-scale integrating projectKoordynator
10043 Orbassano
Włochy
Zobacz na mapie
Uczestnicy (29)
8020 Graz
Zobacz na mapie
52078 Aachen
Zobacz na mapie
45131 ESSEN
Zobacz na mapie
70372 Stuttgart
Zobacz na mapie
Zakończenie uczestnictwa
461 80 Trollhättan
Zobacz na mapie
Zakończenie uczestnictwa
65428 Ruesselsheim
Zobacz na mapie
92400 Courbevoie
Zobacz na mapie
92500 Rueil Malmaison
Zobacz na mapie
00185 Roma
Zobacz na mapie
8010 Graz
Zobacz na mapie
41330 Vihtavuori
Zobacz na mapie
30165 Hannover
Zobacz na mapie
80333 Munchen
Zobacz na mapie
10129 Torino
Zobacz na mapie
412 96 GOTEBORG
Zobacz na mapie
2800 Kongens Lyngby
Zobacz na mapie
52062 Aachen
Zobacz na mapie
5200 BRUGG
Zobacz na mapie
160 00 Praha
Zobacz na mapie
34123 KASSEL
Zobacz na mapie
8010 GRAZ
Zobacz na mapie
12205 Berlin
Zobacz na mapie
50-370 Wroclaw
Zobacz na mapie
4940 BASCHARAGE
Zobacz na mapie
70174 Stuttgart
Zobacz na mapie
20133 Milano
Zobacz na mapie
30239 Krakow
Zobacz na mapie
4940 Bascharage
Zobacz na mapie
65423 RUESSELSHEIM
Zobacz na mapie