Rezultaty
Template documents for HRS consenting phase (odnośnik otworzy się w nowym oknie)
Template documents for HRS consenting phase:The project will lead to the installation of new / upgraded hydrogen refuelling stations in 14 regions across Europe. In three locations (Cologne region, Gävleborg and Reykjavik), existing hydrogen refuelling stations will be used to meet the demands of the additional hydrogen vehicles deployed. Where new HRS deployment is required, the common tasks for each location include: 1.Siting – identifying a suitable site for new HRS. Sites are generally dictated by the requirements of the bus operators, hence most of the stations will be sited at bus depots. 2.Feasibility study – this is to validate that the site is suitable for the installation of a hydrogen refuelling station from a technical, planning and safety perspective. This stage will include establishing a plan for supplying the station with hydrogen fuel, including a back-up supply route.3.Communication – the neighbours of the hydrogen refuelling station, the relevant permitting authorities as well as local first responders will be informed of the project to establish a collaborative working relationship early on.4.Station specification and detailed design – a technical specification for each new hydrogen refuelling station will be released which will include parameters such as HRS capacity (kg/day), refuelling window(s), number of dispensers, pressure (bar), source of hydrogen, on site storage (kg) and accessibility. While stations will be specified to meet the operational needs of the local fleet(s) of buses (which means details of the designs will vary by city), a common theme across the project will be consideration of the scope for expansion to meet the needs of growing fleets of hydrogen buses at each new station.5.Permitting – for each site, the necessary permissions to install the hydrogen refuelling station must be acquired (regulatory approval, landlord approval / lease agreement, planning permission, safety case).6.HRS procurement – stations and hydrogen supplies will be procured on a city-by-city basis. The HRS procurement exercises will run in parallel to bus procurement / build exercises so that the infrastructure is in place ready for the arrival of the first buses in each location.7.Appointment of sub-contractors – typically any civil and electrical engineering work is carried out by sub-contractors appointed by the client. It is usual practice to seek quotations for this work from at least three separate contractors.8.Site preparation – completion of civil and electrical engineering work required to prepare the site for HRS installation. 9.HRS off-site construction – stations are constructed off-site at the premises of the suppliers before being delivered to site for installation.As of Q1 2017, every deployment city participating in the project has completed at least the first two steps outlined above. Plans for HRS deployment will be progressed in parallel to the evaluation of this proposal so that cities can enter the deployment phase relatively early in the project once all funding is confirmed.For deployment cities intending to use existing facilities, preparation activities are already underway:1.Feasibility study – bus operators to work with HRS owners to confirm that the capacity of the station is sufficient to meet the additional demands of the hydrogen fuel cell buses to be deployed. The bus operator will confirm that the hydrogen refuelling station is situated at a location that can be accessed conveniently from their depot(s). 2.Communication – communication with the current owners, customers and neighbours of the refuelling station is essential to establish a good relationship between all parties. This is particularly relevant for projects where the hydrogen fuel cell buses deployed will be refuelled at a publicly available HRS (Reykjavik, Gävleborg).During Task 1.2, regular meetings between deployment cities will enable the lessons learned and recomme
Communication materials to be used during the roadshow (local language) (odnośnik otworzy się w nowym oknie)Demand aggregation workshop report - 1 (odnośnik otworzy się w nowym oknie)
Demand aggregation workshop report:Following the publication of the fuel cell bus commercialisation study in 2015, the FCH JU commissioned a group of cluster coordinators to support cities with developing plans for fuel cell bus deployment and to establish approaches to joint procurement. This work was fully aligned with the study’s recommendations and was central to the establishment of the JIVE and JIVE 2 projects. It also identified potential demand for over 600 fuel cell buses in Europe in the near term. As the contract between the FCH JU and the cluster coordinators is due to expire at the end of 2017, this task will fill the gap created and allow Element Energy to continue coordinating demands for fuel cell buses at a European level. This will involve:•Holding a series of workshops with city representatives from partners within the JIVE / JIVE 2 consortia, the wider observer group (associated with the JIVE project), and any other interested regions. These sessions will allow (i) presentation of the latest developments in the sector to cities who have an interest but not necessarily well developed implementation plans, (ii) open debates on the key issues hampering further roll-out, and (iii) round-table discussions on the latest fuel cell bus roll-out plans in all cities. Element Energy will organise and facilitate these workshops, collecting input and circulating presentation material in advance, and recording key points discussed. The frequency of these meetings will be approximately annual and in the interests of efficiency, the workshops will be arranged alongside other events that are likely to attract the target audience (e.g. General Assembly meetings / the Zero Emission Bus Conference (see WP5)).•Based on the above, maintaining a log of fuel cell bus deployment plans. The status of fuel cell bus roll-out will be characterised by vehicles that are already deployed / planned for deployment (i.e. in funded projects) / desired (i.e. full funding still to be confirmed). This information will be published as a concise European fuel cell bus sector status paper, updated annually, and made available from the project website. This document will help to raise the profile of the sector and indicate to industry the scale of the untapped potential.•Making reports, tools, and other suitable resources such as information on innovative financing mechanisms available to cities seeking to develop business cases for fuel cell bus roll-out. Thus, the impact of the JIVE programmes will be maximised by catalysing further fuel cell bus project development in cities across Europe.
Communication materials to be used during the 2nd roadshow (local language) (odnośnik otworzy się w nowym oknie)Report comparing fuel bus system with diesel and battery electric systems against operational, economic and environmental parameters (odnośnik otworzy się w nowym oknie)
The need to transition from diesel-fuelled to zero emission buses as part of strategies to address poor air quality has been recognised in many cities across Europe and beyond. While hydrogen fuel cell buses are starting to be discussed alongside the more established battery electric options , a lack of clarity on the role of the different options remains.This task will address this knowledge gap amongst operators by comparing fuel cell buses with incumbent (diesel) and alternative zero emission (battery electric) options. The aim is to identify and highlight the areas (both in terms of geography and duty cycles) in which fuel cell buses offer particular advantages. This activity aims to assist operators interested in zero emission bus technologies to understand which technology is most suited for which operational conditions, with a special focus on fuel cell buses. The comparison activity will be led by thinkstep, who will draw on the extensive data sets collected in WP3, along with qualitative evidence from cities / operators provided through the regular consortium meetings. In addition, available (non-confidential) information, data and results from activities focusing on battery electric buses will be utilised. thinkstep is involved in the monitoring activities for the European ZeEUS demonstration project led by UITP and can also draw on German national activities in this area (E-bus demonstration programme of the Federal Ministry of Transportation) and is able to use publicly available information. These data will be used along with publicly available information from other activities e.g. the UK Low Carbon Vehicle partnership. This comparison will not be a formal benchmarking exercise as such an activity would need to be carried out with all investigated technologies being operated and monitored under comparable conditions i.e. buses running in the same city on the same routes. It will be a qualitative comparison which will be complemented with quantitative data and information which is permitted to be used and appropriate for the discussion.The comparison of fuel cell bus performance will focus on metrics of particular interest to operators. These will include: total cost of ownership, vehicle reliability, range, refuelling times (per bus and for an entire fleet), space implications for infrastructure, passenger capacity, etc. Fuel cell buses will be compared against diesel and battery electric vehicles for up to three scenarios relevant to typical operational environments.The main output of this activity will be a report in which the performance of fuel cell buses relative to alternatives is discussed, and environments to which the FC vehicles are particularly well suited are identified.
First Best Practice Information Bank Report (odnośnik otworzy się w nowym oknie)First Best Practice Information Collation Report
FC bus deployment implementation plan (odnośnik otworzy się w nowym oknie)FC bus deployment implementation plan:Taking the outputs from the preceding tasks (4.1 and 4.2), Element Energy/ERM will develop a vision for further uptake of FC buses in Europe. This will involve identifying the most promising locations for additional deployment and exploring the remaining barriers to market.Together with previous projects, JIVE 2 will see the deployment of hundreds of fuel cell buses in Europe. While this represents good progress towards realising the vision of fully commercial fuel cell buses being available in the 2020s, various barriers to fuel cell buses reaching their full potential are likely to remain for several years. The relative importance of different barriers (technical, economic, regulatory, awareness, etc.) is expected to shift over time and in this task, Element Energy/ERM will map out the remaining issues and where possible facilitate their resolution, or as a minimum make recommendations on appropriate next steps. One of the medium-term challenges relates to providing cost-effective low carbon (“green”) hydrogen supplies. JIVE 2 includes several sites that will demonstrate solutions to this challenge and using examples from this project, along with additional analysis as required, Element Energy/ERM will summarise the options for green hydrogen supplies. The key output will be a vision for increased production and use of low carbon hydrogen across the fuel cell bus sector.The barrier identification / resolution work will be based on collating and recording common issues encountered by the partners deploying hardware through the project (from task 3.3), and holding discussions with bus OEMs (and with other supply chain organisations as necessary) to understand the conditions under which further scale-up is possible: rate of increase in production capacities possible, any bottlenecks in the supply chain, etc. The costs of avoiding the health impacts from diesel bus emissions are currently borne by bus operators purchasing and operating zero emission buses, but the benefits accrue to the general community. This un-balanced distribution of costs and benefits means that it is likely that some form of regulation or incentive scheme for zero emission buses will be required for fuel cell buses to compete with diesel vehicles on an economic basis in the medium term. In this case, it will also be necessary to engage with policy makers to understand the latest thinking and uncover any residual concerns that may impede the introduction of such mechanisms.The resulting FC bus deployment implementation plan will be a useful resource for the sector as a whole for understanding the actions required to overcome remaining barriers and unlock the demands for fuel cell buses in cities / regions across Europe (as identified in task 4.1)
Key learnings and impacts from the 2nd JIVE 2 CEE Bus Roadshow (odnośnik otworzy się w nowym oknie)This deliverable (D4.21) “Key learnings and impacts from the 2nd JIVE 2 CEE Bus Roadshow” will be developed by Element Energy thanks to the inputs of the reports from the national coordinators. It will describe the course of the second roadshow and associated events, results of the test trails and discussions and the lessons learnt/impacts of the roadshow in the area.
Best Practice Guide for Fuel Cell Bus Maintenance Workshops (odnośnik otworzy się w nowym oknie)Best Practice Guide for Fuel Cell Bus Maintenance Workshops.
Report on environmental impacts and external cost benefits of fuel cell hydrogen bus systems (odnośnik otworzy się w nowym oknie)Press release on the workshop and report on supply and demand for alternative FCBs in Europe (odnośnik otworzy się w nowym oknie)
Operators' guide to fuel cell bus deployment - version 1 (odnośnik otworzy się w nowym oknie)
Operators’ guide to fuel cell bus deployment – version 1.0:Information received from potential hydrogen fuel cell bus suppliers during the JIVE project suggested that a lead time of at least one year is expected from the date of order to the delivery of the first buses. This lead time is expected to decrease as bus suppliers invest in their production lines in preparation for a larger-scale roll out of buses. However, depending on the results of the tendering process for each cluster and the number of bus manufacturers involved, there may be a need to adopt a phased approach to bus deployment. Where possible, the project will deploy buses in batches to complement the service requirements of the bus operators. The expected bus deployment timeline is shown in Figure 7 in section 1.3.2.3, with the first deployment of buses expected during the first quarter of 2019. Previous projects such as CHIC and High V.Lo City suggest that teething issues during the initial introduction of the fuel cell buses is common and a lower availability phase at the start of the project should be expected. Therefore, this project includes a six month teething period during which suppliers will iron out any technical issues with the vehicles and maintenance teams become experienced in carrying out preventative and corrective maintenance. By building upon the lessons learned during previous fuel cell bus demonstrations and deploying buses with a number of technical improvements, the JIVE 2 project aims to reduce the length of this teething period and achieve high average fleet availability (>90%) from early in the operational phase. In order to capture the lessons learnt during the initial deployment phase, brief reports of issues encountered and recommendations on how to avoid them will be prepared for each deployment location. These reports will be collated into an overarching “lessons learnt from fuel cell bus deployment” report, which will form part of the Best Practice Reports.
Key learnings and impacts from the 4th JIVE 2 Bus Roadshow (odnośnik otworzy się w nowym oknie)This deliverable (D4.25) “Key learnings and impacts from the 4th JIVE 2 Scandinavian Bus Roadshow” will be developed by ERM thanks to the inputs of the reports from the national coordinators (D4.22) as well as feedback/input from other project partners (e.g. infrastructure providers, Hydrogen Europe, H2LV, UITP, etc.). It describes the course of the fourth roadshow and associated events, results of the test trails and discussions and the lessons learnt/impacts of the roadshow in the area.
Demand aggregation workshop report - 4 (odnośnik otworzy się w nowym oknie)Demand aggregation workshop report:Following the publication of the fuel cell bus commercialisation study in 2015, the FCH JU commissioned a group of cluster coordinators to support cities with developing plans for fuel cell bus deployment and to establish approaches to joint procurement. This work was fully aligned with the study’s recommendations and was central to the establishment of the JIVE and JIVE 2 projects. It also identified potential demand for over 600 fuel cell buses in Europe in the near term. As the contract between the FCH JU and the cluster coordinators is due to expire at the end of 2017, this task will fill the gap created and allow Element Energy/ERM to continue coordinating demands for fuel cell buses at a European level. This will involve:•Holding a series of workshops with city representatives from partners within the JIVE / JIVE 2 consortia, the wider observer group (associated with the JIVE project), and any other interested regions. These sessions will allow (i) presentation of the latest developments in the sector to cities who have an interest but not necessarily well developed implementation plans, (ii) open debates on the key issues hampering further roll-out, and (iii) round-table discussions on the latest fuel cell bus roll-out plans in all cities. Element Energy/ERM will organise and facilitate these workshops, collecting input and circulating presentation material in advance, and recording key points discussed. The frequency of these meetings will be approximately annual and in the interests of efficiency, the workshops will be arranged alongside other events that are likely to attract the target audience (e.g. General Assembly meetings / the Zero Emission Bus Conference (see WP5)).•Based on the above, maintaining a log of fuel cell bus deployment plans. The status of fuel cell bus roll-out will be characterised by vehicles that are already deployed / planned for deployment (i.e. in funded projects) / desired (i.e. full funding still to be confirmed). This information will be published as a concise European fuel cell bus sector status paper, updated annually, and made available from the project website. This document will help to raise the profile of the sector and indicate to industry the scale of the untapped potential.•Making reports, tools, and other suitable resources such as information on innovative financing mechanisms available to cities seeking to develop business cases for fuel cell bus roll-out. Thus, the impact of the JIVE programmes will be maximised by catalysing further fuel cell bus project development in cities across Europe.
Press releases announcing major milestones in local projects (odnośnik otworzy się w nowym oknie)Applicable to all local project coordinators. Press releases will recur throughout the project and be made in line with local milestonesWell informed and engaged local stakeholders are crucial for the success of any existing project and its continuation. Furthermore, the introduction of FC buses and HRS to a city provides a unique opportunity to raise awareness of the technology and stimulate follow-on activities.Local dissemination activities will provide targeted information about the project and FC bus technology (status, outlook, benefits, opportunities) to support the creation of local networks of interested parties, manage the acceptance level (especially during the first part of the project when partners may be experimenting teething periods), and prepare for expansion of FC bus fleets. Details of the dissemination activities in each deployment city will vary, taking account of the local context and key priorities. However, the following are expected in each location:•Events and press releases marking major milestones in the project (delivery of buses, HRS opening, mileage milestones being met, etc.).•Attendance of bus operators / city representatives at relevant events and conferences where project activities and key lessons can be shared with various audiences. Note that the city / regional representatives have agreed to make buses available to support dissemination activities, with an allowance of up to five bus days per site over the course of the project.•Regular briefings to local politicians, transport sector representatives, and others with an interest in understanding latest progress and how challenges are being overcome.•Local dissemination materials to be used at relevant events (leaflets, posters, videos, etc.).To ensure consistent reporting of dissemination activities, a dissemination tracking system will be used, following the approach in place in the JIVE project.
Communication materials to be used during the 4th roadshow (local language) (odnośnik otworzy się w nowym oknie)Communication materials to be used during the roadshow (English) (odnośnik otworzy się w nowym oknie)
UITP Knowledge report (reference here) based on D4.13 designed and translated in ECE languages. (odnośnik otworzy się w nowym oknie)
UITP Knowledge report (reference here) designed and tra nslated in ECE languages.
Performance Assessment Handbook (odnośnik otworzy się w nowym oknie)Performance Assessment Handbook:The evaluation methodology defined in the Performance Assessment Handbook will make extensive use of the assessment frameworks that were developed and applied in current and previous FC bus projects (e.g. JIVE, CHIC, HyTransit, HyFLEET:CUTE) to ensure a consistent evaluation approach using comparable performance indicators. Importantly, this approach will enable comparisons between projects and technology over time. The Handbook will define:•The indicators for assessing the performance of the fuel cell bus and associated hydrogen infrastructure as well as comparison to a reference technology (e.g. diesel ICE).•The data points required to carry out the planned analysis work and to calculate the performance indicators.•The data formats required, the frequency of data collection and related details.The Handbook will be available in month 4. It is important that it is available early in the project so the data requirements are available in a timely manner for the bus and HRS operators / owners to consider in their procurement processes, and possibly included in their call for tenders.
Collation of training materials for staff involved in bus operation (odnośnik otworzy się w nowym oknie)Collation of training materials for staff involved in bus operation:While the bus procurement activities will be managed mainly on a cluster-by-cluster basis as outlined above, this project provides the opportunity to share information between clusters / countries. This includes details of the procurement strategies in each region, timelines for launching tendering exercises, vehicle technical specifications, information from suppliers on pricing, lead times, etc. Furthermore, city representatives will have the opportunity to compare approaches to hydrogen supply, depot upgrades, and planned maintenance strategies for the buses. As part of the regular consortium calls (see WP6), the cities across the project will have the opportunity to exchange information and compare experiences relating to bus procurement and general preparation for deployment. This will be particularly beneficial for those cities / regions deploying the technology for the first time. Element Energy will arrange dedicated calls between the relevant partners for more in-depth discussions on these topics as necessary. This approach will ensure that procurement exercises are aligned not just within clusters, but across the project as a whole, which will in turn ensure that economies of scale are maximised and that suppliers are able to offer the lowest possible prices
Operators' guide to fuel cell bus deployment - final (odnośnik otworzy się w nowym oknie)Operators’ guide to fuel cell bus deployment – final:Information received from potential hydrogen fuel cell bus suppliers during the JIVE project suggested that a lead time of at least one year is expected from the date of order to the delivery of the first buses. This lead time is expected to decrease as bus suppliers invest in their production lines in preparation for a larger-scale roll out of buses. However, depending on the results of the tendering process for each cluster and the number of bus manufacturers involved, there may be a need to adopt a phased approach to bus deployment. Where possible, the project will deploy buses in batches to complement the service requirements of the bus operators. The expected bus deployment timeline is shown in Figure 7 in section 1.3.2.3, with the first deployment of buses expected during the first quarter of 2019. Previous projects such as CHIC and High V.Lo City suggest that teething issues during the initial introduction of the fuel cell buses is common and a lower availability phase at the start of the project should be expected. Therefore, this project includes a six month teething period during which suppliers will iron out any technical issues with the vehicles and maintenance teams become experienced in carrying out preventative and corrective maintenance. By building upon the lessons learned during previous fuel cell bus demonstrations and deploying buses with a number of technical improvements, the JIVE 2 project aims to reduce the length of this teething period and achieve high average fleet availability (>90%) from early in the operational phase. In order to capture the lessons learnt during the initial deployment phase, brief reports of issues encountered and recommendations on how to avoid them will be prepared for each deployment location. These reports will be collated into an overarching “lessons learnt from fuel cell bus deployment” report, which will form part of the Best Practice Reports.
Demand Aggregation workshop report - 2 (odnośnik otworzy się w nowym oknie)Demand aggregation workshop report:Following the publication of the fuel cell bus commercialisation study in 2015, the FCH JU commissioned a group of cluster coordinators to support cities with developing plans for fuel cell bus deployment and to establish approaches to joint procurement. This work was fully aligned with the study’s recommendations and was central to the establishment of the JIVE and JIVE 2 projects. It also identified potential demand for over 600 fuel cell buses in Europe in the near term. As the contract between the FCH JU and the cluster coordinators is due to expire at the end of 2017, this task will fill the gap created and allow Element Energy to continue coordinating demands for fuel cell buses at a European level. This will involve:•Holding a series of workshops with city representatives from partners within the JIVE / JIVE 2 consortia, the wider observer group (associated with the JIVE project), and any other interested regions. These sessions will allow (i) presentation of the latest developments in the sector to cities who have an interest but not necessarily well developed implementation plans, (ii) open debates on the key issues hampering further roll-out, and (iii) round-table discussions on the latest fuel cell bus roll-out plans in all cities. Element Energy will organise and facilitate these workshops, collecting input and circulating presentation material in advance, and recording key points discussed. The frequency of these meetings will be approximately annual and in the interests of efficiency, the workshops will be arranged alongside other events that are likely to attract the target audience (e.g. General Assembly meetings / the Zero Emission Bus Conference (see WP5)).•Based on the above, maintaining a log of fuel cell bus deployment plans. The status of fuel cell bus roll-out will be characterised by vehicles that are already deployed / planned for deployment (i.e. in funded projects) / desired (i.e. full funding still to be confirmed). This information will be published as a concise European fuel cell bus sector status paper, updated annually, and made available from the project website. This document will help to raise the profile of the sector and indicate to industry the scale of the untapped potential.•Making reports, tools, and other suitable resources such as information on innovative financing mechanisms available to cities seeking to develop business cases for fuel cell bus roll-out. Thus, the impact of the JIVE programmes will be maximised by catalysing further fuel cell bus project development in cities across Europe.
Report on supply and demand for alternative FCBs in Europe (odnośnik otworzy się w nowym oknie)Second Best Practice Information Bank Report (odnośnik otworzy się w nowym oknie)
Second Best Practice Information Collation Report
Report on the lessons learned from joint procurement (odnośnik otworzy się w nowym oknie)Report on the lessons learned from joint procurement:Joint procurement of FC buses is a central aspect to the early phase of this project, during which orders for all vehicles will be placed with the selected suppliers. The planned procurement activities in each cluster are described below. In all cases the tender documents will reflect the conditions / targets of this project in terms of technology readiness, efficiency, availability, etc. Given the need for high availability of the vehicles, the suppliers will be required to offer tailored training and maintenance support packages that fit with the experience and needs of each operator. Furthermore, the tender documents will seek information on the provenance of key components of the vehicles and their powertrains to allow an assessment of the extent to which European supply chains are being developed for this project.
Third Best Practice Information Bank Report (odnośnik otworzy się w nowym oknie)Third best practice report information bank report
Demand Aggregation workshop report - 3 (odnośnik otworzy się w nowym oknie)Demand aggregation workshop report:Following the publication of the fuel cell bus commercialisation study in 2015, the FCH JU commissioned a group of cluster coordinators to support cities with developing plans for fuel cell bus deployment and to establish approaches to joint procurement. This work was fully aligned with the study’s recommendations and was central to the establishment of the JIVE and JIVE 2 projects. It also identified potential demand for over 600 fuel cell buses in Europe in the near term. As the contract between the FCH JU and the cluster coordinators is due to expire at the end of 2017, this task will fill the gap created and allow Element Energy/ERM to continue coordinating demands for fuel cell buses at a European level. This will involve:•Holding a series of workshops with city representatives from partners within the JIVE / JIVE 2 consortia, the wider observer group (associated with the JIVE project), and any other interested regions. These sessions will allow (i) presentation of the latest developments in the sector to cities who have an interest but not necessarily well developed implementation plans, (ii) open debates on the key issues hampering further roll-out, and (iii) round-table discussions on the latest fuel cell bus roll-out plans in all cities. Element Energy / ERM will organise and facilitate these workshops, collecting input and circulating presentation material in advance, and recording key points discussed. The frequency of these meetings will be approximately annual and in the interests of efficiency, the workshops will be arranged alongside other events that are likely to attract the target audience (e.g. General Assembly meetings / the Zero Emission Bus Conference (see WP5)).•Based on the above, maintaining a log of fuel cell bus deployment plans. The status of fuel cell bus roll-out will be characterised by vehicles that are already deployed / planned for deployment (i.e. in funded projects) / desired (i.e. full funding still to be confirmed). This information will be published as a concise European fuel cell bus sector status paper, updated annually, and made available from the project website. This document will help to raise the profile of the sector and indicate to industry the scale of the untapped potential.•Making reports, tools, and other suitable resources such as information on innovative financing mechanisms available to cities seeking to develop business cases for fuel cell bus roll-out. Thus, the impact of the JIVE programmes will be maximised by catalysing further fuel cell bus project development in cities across Europe.
Best Practice Tool for Sweden with reference to the broader Northern European context. (odnośnik otworzy się w nowym oknie)Project brochure (odnośnik otworzy się w nowym oknie)
Project brochureA newsletter is important to summarise the latest news and make announcements accessible to the wider public and the other target groups. Therefore, a newsletter will be prepared and sent when milestones are reached. In addition, the newsletter should also have an educational character, as information about the technology itself will be explained in a simple and digestible way. Making use of the social media campaign above, it is expected that subscribers will increase over time and will therefore increase the impact of key messaging and content dissemination.
Communication materials to be used during the 2nd roadshow (English) (odnośnik otworzy się w nowym oknie)Lessons learnt from the CEE bus roadshow (odnośnik otworzy się w nowym oknie)
"Updated Regularly:Joint communication across projectsTo maximise impact and the chances of successfully commercialising FC buses, the JIVE 2 core messaging will need to be coordinated with related demonstrations already underway in Europe. It will also be important to link with the FCH JU-assembled fuel cell bus coalition and any on-going cluster coordination activities.The partners will seek to ensure consistency in the communications among other things on costs, technical readiness level and next steps for the sector. The dissemination team will set up regular dissemination meetings with the organisations responsible for other fuel cell bus demonstration projects. This work had started as part of previous projects but will need to be continued and strengthened. The main points where alignment is expected is in:•Definition of a set of core messages on fuel cell buses including use of common wording.•Use of a common hashtag #zeroemission #cleanair etc. to increase the scale and impact of social media-based dissemination. •The need to describe the sector as a whole and not overly focus on projects individually.•Contacts – particularly with European and national bodies who will be targeted for dedicated dissemination.•A shared calendar of communication activities (with joint-events when possible).•Collaboration on which publications to target.The dissemination partners in the other fuel cell bus projects have already been identified and support the objective of an active collaboration. The partners suggest going one step further and carrying out common dissemination activities, with the establishment of the common web portal gathering all information on the fuel cell bus sector. Preliminary discussions have started on the possibility of merging the different fuel cell bus project websites."
Website available (odnośnik otworzy się w nowym oknie)Website available:The objective is to create an ambitious web portal containing all activities relevant for the sector. The existing www.fuelcellbuses.eu website will serve as a basis for this task. However, the current version of this website is made in a form of a glossary (a wiki page) addressing primarily bus operators. In JIVE 2, the ambition will be to create a larger version of this website, integrating general information, news, events, videos, picture galleries, social media feeds etc. to create a centralised information hub for the fuel cell bus sector.The web portal will not only address operators. The aim will be to target different audiences via dedicated pages, for example an attractive, “glossy” page to attract the general public. The website should become the primary source of information on the sector and will integrate information about other European fuel cell bus projects in addition to existing educational resources. This novel approach is very much needed as it will consolidate information from a number of different online resources and will ensure that the visibility of www.fuelcellbuses.eu is enhanced.Hydrogen Europe are already cooperating with the owners of the www.fuelcellbuses.eu website on options for improving and expanding the site. This includes a discussion on merging the other fuel cell bus projects’ websites. Different channels will be explored to maximize the visibility of the website such as: regularly generating new content (with personalisation such as interview of partners), maintaining a proactive presence on twitter referencing the website, adding videos, posting on Linkedin, etc.