Other documents
- Press release at the start of the project
- Publishable Summary
- Risk management plan
- Semi-annual project progress report
- Promotional flyer
- Press release at the end of the project
- Project activity report P2
- Report: techniques for enhancing interconnect variability tolerance
- Dissemination and use plan first issue
- Report: Software techniques for flexible data allocation
- Final Report
- Project activity report P1
- Dissemination and use plan (second issue)
- Report: techniques for enhancing data path and controller variability tolerance
- Publishable Summary
- Project activity report P3
- Variability simulation and comparison for the 45 nm technology generation
- Report on methodology for percolating variability sensitivity
- Validation plan for the evaluation of the results for both individual blocks and the system platform as defined by WP2,3,4,5
- Report: : Control algorithms for system level reliability and variability management
- Report on Variation-Aware electronic information format
- Report on Variation-Aware Statistical Characterization Techniques
- Poster presented at "Design, Automation & Test in Europe" exhibition (http://www.date-conference.co